Final Environmental Documents
The following final environmental documents prepared by the City of San Diego are available to view or download. Each final document includes:
- A revised document (as necessary);
- Comments received during the public comment period; and
- A list of commenters and responses to each comment.
(Torrey Pines and University) Los Peñasquitos Lagoon Restoration Phase 1 / Project No. 697735 / Addendum / SCH No. 2017121036
- Addendum No. 697735
- Environmental Impact Report
- Design Plans
- Operation and Maintenance Plan
- Biological Technical Report
- Addendum to Biological Technical Report - Lagoon Marine Survey and Essential Fish Habitat Assessment
- Hydrologic and Hydraulic Report
- Hydrologic and Sediment Modeling for Freshwater Channels
- Water Quality and Hydrology Environmental Assessment Report
Posted by Engineering & Capital Projects
(North City Future Urbanizing Area (NCFUA) Framework Plan) El Camino Real Assisted Living Facility / Project No. 675732 / SCH No. 201371042
Subsequent Environmental Impact Report
Appendix A.1 - Notice of Preparation
Appendix A. 2 - Notice of Preparation Comment Letters
Appendix B - Phase I Environmental Site Assessment
Appendix C - Air Quality Modeling
Appendix D - Biological Technical Report
Appendix E - Climate Action Plan Consistency Checklist
Appendix F - Cultural Resources Inventory and Evaluation Report
Appendix G - Geotechnical Update and Storm Water Infiltration Study
Appendix H.1 - Access Analysis
Appendix L - Stormwater Quality Management Plan
Appendix M - Waste Management Plan
Appendix O - Fire Fuel Load Modeling Report
Appendix P - Construction Noise Avoidance Alternative Calculation Worksheets
Appendix Q - Emergency and Disaster Plan
Posted by Development Services Department
(North City Future Urbanizing Area) Via de la Valle Pipeline Replacement Project / WBS No. B-22015 / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(Carmel Valley) 3060 Carmel Valley Road / PRJ – 1054862 / Addendum
- Addendum No. 1054862
- Negative Declaration No. 87-1054
- Climate Action Plan Consistency Checklist
- Drainage Study
- Geotechnical Investigation Report
- Noise Study
- Soils Management Plan
- Storm Water Quality Management Plan
- Traffic Study
Posted by Development Services Department
(Clairemont Mesa and Pacific Beach) Sewer & AC Water Group 1058 / WBS No. B-18193 (W), B-18191 (S) / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(Pacific Beach) Pacific Beach Improv 1 / WBS No. 19142 / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(Fairbanks Ranch Country Club) San Dieguito River Park Joint Powers Authority Osuna Segment of the Coast to Crest Trail / PRJ-1049410 / SCH No. 2023050120
- Final Mitigated Negative Declaration SCH No. 2023050120
- Mitigation Monitoring and Reporting Program
- Appendix A: Biological Technical Report
- Appendix B: Cultural Resource Inventory Report for the Osuna Trail
- Appendix C: Plan Sheets
- Appendix D: Foundation Report
- Appendix E: Hydrology Report
- Greenhouse Gas Emissions Consistency Memo
- Stormwater Requirements Applicability Checklist
- Stormwater Quality Management Plan
- Transportation Study Manual Project Information Form
Posted by Development Services Department
(Encanto Neighborhoods) Valencia Park Improvements 2 / WBS No. 20132 & 20135 / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(Downtown, Encanto Neighborhoods, Greater Golden Hill, La Jolla, Linda Vista, Midway-Pacific Highway, Pacific Beach, Southeastern San Diego) Accelerated Sewer Referral Group 847 / WBS No. 18183 / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(Clairemont Mesa) Clairemont Village / Project No. PRJ-069307 / Subsequent Mitigated Negative Declaration / SCH No. 2019060003
Subsequent Mitigated Negative Declaration
Additional Site Investigation Report
Fault Rupture Hazard Investigation
Phase I Environmental Site Assessment
Storm Water Quality Management Plan
Vehicle Miles Traveled Assessment
VMT Assessment Supplemental Memo
Posted by Development Services Department
(La Jolla) Romero Subdivision / Project No. PRJ – 1063767 / Addendum / SCH No. 2014051069
Environmental Impact Report No. 292065
Geotechnical Investigation Report
Preliminary Hydrology Drainage Study
Storm Water Quality Management Plan
Posted by Development Services Department
(Peninsula) Stormwater Diversion at the Point Loma Wastewater Treatment Plant / Project No. 1084313 / Addendum / SCH No. 94-101024
- Addendum No. 94-0510
- Environmental Impact Report No. 94-101024
- Appendix A: Biological Technical Report
- Appendix B: Geotechnical Addendum and Response to City Review Comments
- Appendix C: Geotechnical Investigation Report
- Appendix D: Archaeological Resources Report Form
- Appendix E: Hydrology and Hydraulics Validation Study
- Appendix F: Climate Action Plan (CAP) Memo for the Point Loma Wastewater Treatment Plant Stormwater Diversion Project
Posted by Engineering & Capital Projects
(Otay Nestor) Palm & Hollister Apartments / PRJ – 0698277 / Environmental Impact Report / SCH No. 2022060468
Draft Finding of Fact and Statement of Overriding Considerations
Appendix A – Notice of Preparation and Letter of Comment
Appendix B – FAA Determination of No Hazard to Air Navigation Letters
Appendix C – Vehicle Miles Traveled Memo
Appendix D – Local Mobility Analysis
Appendix E – Air Quality Report
Appendix F- Biological Technical Report
Appendix G – Letters Responses to Service Providers
Appendix H – Preliminary Geotechnical Investigation and Design Recommendations
Appendix I – Supplemental Geotechnical Investigation and Design Recommendations
Appendix J – Phase I Environmental Site Assessment
Appendix K – Phase II Site Assessment
Appendix L – Environmental facts Database, Geo tracker, and Cortese List
Appendix M – Negative Survey Report Using the Archaeological Resource Report Form
Appendix O – Exterior Noise Analysis
Appendix P – Waste Management Plan
Appendix R – Storm Water Quality Management Plan
Appendix T – Geotechnical Addendum
Appendix U – Conditional Letter of Map Revision
Appendix V – Energy Calculations
Appendix W – Transportation Technical Memorandum
Posted by Development Services Department
(Rancho Encantada) Nighthawk BESS Gen-Tie Line – 14110 Stonebridge Parkway / PRJ-1075505 / Addendum / SCH No. 84053008/SCH No. 2000011053
Rancho Encantada Precise Plan EIR (LDR No. 99-1099/SCH No. 2000011053)
South Poway Planned Development EIR (SCH No. 84053008)
Appendix A – Air Quality and Greenhouse Gas Analysis
Appendix B – Poway Biological Technical Report
Appendix C – 2024 Focused Crotch Bumble Bee Survey Report
Appendix D – San Diego Biological Technical Report
Appendix E – San Diego Biological Restoration Plan
Appendix F – San Diego Mitigation, Monitoring and Reporting Program
Appendix G – Poway Cultural Resources Inventory
Appendix H – San Diego Cultural Resources Inventory
Appendix I – San Diego Geologic Reconnaissance Letter
Appendix J – Fire Hazard and Mitigation and Prevention Plan
Posted by Development Services Department
(La Jolla) 6110 Camino De La Costa / PRJ – 1066101 / Environmental Impact Report / SCH No. 2023070270
Findings and Statement of Overriding Considerations
Appendix A – Notice of Preparation and Notice of Preparation Response
Appendix B – Preliminary Geotechnical Investigation
Appendix D – Historical Resources Technical Report
Appendix E – Historic Monitoring Report
Appendix F – Structural Review of Field Conditions
Appendix G – Coastal Hazard and Wave Runup Analysis
Appendix H – Supplemental Geotechnical Review and Analysis
Appendix I – Climate Action Plan Consistency Checklist
Posted by Development Services Department
(Citywide, Uptown, University) Final Program Environmental Impact Report for the Blueprint SD Initiative, Hillcrest Focused Plan Amendment to the Uptown Community Plan, and University Community Plan and Local Coastal Program Update/ SCH No. 2021070359
Final PEIR/ SCH No. 2021070359
- Appendix A Notice of Preparation of a Draft PEIR for Blueprint San Diego
- Appendix B University Historic Context Statement
- Appendix C University Community Plan Focused Reconnaissance Survey
- Appendix D Biological Resources Report University CPU
- Appendix E Desktop Geotechnical and Geologic Hazard Evaluation University Community Plan Update April 2020
- Appendix F Hazardous Materials Technical Study University Community Plan Update April 2020
- Appendix G Blueprint San Diego Cultural Resources Analysis
- Appendix H-1 Cultural Resources Constraints and Sensitivity Analysis for University Community Plan
- Appendix H-2 Hillcrest FPA LGBTQ HCS
- Appendix I-1 Hillcrest Focused Plan Amendment - Potential Student Generation letter - December 2023
- Appendix I-2 University Community Plan Update - Potential Student Generation letter - September 2023
- Appendix J VMT Analysis for Blueprint SD Initiative, UCPU, HFPA
- Appendix K-1 CalEEMod - Blueprint - Hypothetical Project #1 Detailed Report
- Appendix K-2 CalEEMod - Blueprint - Hypothetical Project #2 Detailed Report
- Appendix L-1 Request for WSA for the Hillcrest Focused Plan Amendment
- Appendix L-2 Water Supply Assessment Hillcrest Focused Plan Amendment
- Appendix M-1 Request for WSA for the University CPU
- Appendix M-2 University CPU Water Supply Assessment Report
- Appendix N Blueprint SD Progress Towards Mode Share Goals
Posted by City Planning Department
(Clairemont Mesa/ La Jolla/ Mira Mesa/ Otay Mesa-Nestor/ Rancho Penasquitos) Citywide Referral Rehab 1 / Project No. B-24043.02.06 / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(Carmel Valley) Chan & Chung Single Family Residence / Project No. 698398 / Mitigated Negative Declaration / SCH No. 2024050336
- Errata Date July 2, 2024
- Mitigated Negative Declaration
- Archaeological Report
- Biology Survey Report
- Climate Action Plan Consistency Checklist
- Solis Report
- Storm Water Quality Management Plan
Posted by Development Services Department
(Downtown & Greater Golden Hill) East Village Improvements 1 / Project No. 706917 / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(City Heights) Storage Variance / EV 5150 University Avenue / Project No. 682266 / Negative Declaration / SCH No. 2024050216
- Errata Date July 8, 2024
- Negative Declaration
- Drainage Study
- Sewer Study
- Soils Report
- Storm water Quality Management Plan
- Waste Management Plan
Posted by Development Services Department