Final Environmental Documents
The following final environmental documents prepared by the City of San Diego are available to view or download. Each final document includes:
- A revised document (as necessary);
- Comments received during the public comment period; and
- A list of commenters and responses to each comment.
(La Jolla) 1821 Viking Way / Project No. PRJ-1114539 / Mitigated Negative Declaration / SCH- 2024110673
Posted by Development Services Department
(La Jolla) 1821 Viking Way / Project No. PRJ-1114539 / Mitigated Negative Declaration / SCH- 2024110673
Posted by Development Services Department
(Otay Mesa) Nakano Project / Project No. 1076302 / Environmental Impact Report No. 22-001 / SCH No. 2022060260
- Environmental Impact Report
- Appendix A - Notice of Preparation and Comment Letters
- Appendix B - Environmental Policy and Consistency Analysis
- Appendix C - Air Quality Technical Report
- Appendix D - Biology Report
- Appendix E.1 - Geotechnical Investigation
- Appendix E.2 - Update to Geotechnical Investigation
- Appendix E.3 - Addendum to Geotechnical Report and Response to City of San Diego Review Comments
- Appendix E.4 - Response to City of San Diego Comments
- Appendix E.5 - Infiltration Feasibility Condition Letter
- Appendix E.6 - Response to City Comments
- Appendix F.1 - Paleontological Report
- Appendix F.2 - Paleontological Report Addendum
- Appendix G - Greenhouse Gas Emissions Analysis Technical Report
- Appendix H.1 - Phase I Environmental Site Assessment - Nakano Property
- Appendix H.2 - Phase I Environmental Site Assessment - Davies Property
- Appendix H.3 - Soil and Groundwater Sampling Report - Davies Property
- Appendix H.4 - Health Risk Assessment
- Appendix H.5 - Public Notice - Results of Site Investigations and Request for Site Closure
- Appendix H.6 - Results of Site Investigations and Request for Site Closure
- Appendix I - Fire Protection Plan
- Appendix J - Evacuation Plan
- Appendix K.1 - Historical Resources Inventory and Evaluation Report
- Appendix K.2 - Historical Resources Inventory and Evaluation Addendum
- Appendix K.3 - Native American Heritage Commission List
- Appendix L - Noise Technical Report
- Appendix M.1 - Vehicle Miles Traveled Analysis
- Appendix M.2 - Local Mobility Analysis
- Appendix N - Priority Development Project Storm Water Quality Management Plan (Part 1)
- Appendix N - Priority Development Project Storm Water Quality Management Plan (Part 2)
- Appendix N - Priority Development Project Storm Water Quality Management Plan (Part 3)
- Appendix N - Priority Development Project Storm Water Quality Management Plan (Part 4)
- Appendix O - Federal Emergency Management Agency Approval of Letter of Map Amendment
- Appendix P.1 - Public Facilities Finance Plan
- Appendix P.2 - Plan for Services
- Appendix Q - Service Letters & Responses
- Appendix R - City of San Diego Correspondence - DSD Engineering Division, Water and Sewer Section
- Appendix S - Sewer Study
- Appendix T - Water Analysis
- Appendix U - Waste Management Plan
Posted by Development Services Department
(Otay Mesa) Nakano Project / Project No. 1076302 / Environmental Impact Report No. 22-001 / SCH No. 2022060260
- Environmental Impact Report
- Appendix A - Notice of Preparation and Comment Letters
- Appendix B - Environmental Policy and Consistency Analysis
- Appendix C - Air Quality Technical Report
- Appendix D - Biology Report
- Appendix E.1 - Geotechnical Investigation
- Appendix E.2 - Update to Geotechnical Investigation
- Appendix E.3 - Addendum to Geotechnical Report and Response to City of San Diego Review Comments
- Appendix E.4 - Response to City of San Diego Comments
- Appendix E.5 - Infiltration Feasibility Condition Letter
- Appendix E.6 - Response to City Comments
- Appendix F.1 - Paleontological Report
- Appendix F.2 - Paleontological Report Addendum
- Appendix G - Greenhouse Gas Emissions Analysis Technical Report
- Appendix H.1 - Phase I Environmental Site Assessment - Nakano Property
- Appendix H.2 - Phase I Environmental Site Assessment - Davies Property
- Appendix H.3 - Soil and Groundwater Sampling Report - Davies Property
- Appendix H.4 - Health Risk Assessment
- Appendix H.5 - Public Notice - Results of Site Investigations and Request for Site Closure
- Appendix H.6 - Results of Site Investigations and Request for Site Closure
- Appendix I - Fire Protection Plan
- Appendix J - Evacuation Plan
- Appendix K.1 - Historical Resources Inventory and Evaluation Report
- Appendix K.2 - Historical Resources Inventory and Evaluation Addendum
- Appendix K.3 - Native American Heritage Commission List
- Appendix L - Noise Technical Report
- Appendix M.1 - Vehicle Miles Traveled Analysis
- Appendix M.2 - Local Mobility Analysis
- Appendix N - Priority Development Project Storm Water Quality Management Plan (Part 1)
- Appendix N - Priority Development Project Storm Water Quality Management Plan (Part 2)
- Appendix N - Priority Development Project Storm Water Quality Management Plan (Part 3)
- Appendix N - Priority Development Project Storm Water Quality Management Plan (Part 4)
- Appendix O - Federal Emergency Management Agency Approval of Letter of Map Amendment
- Appendix P.1 - Public Facilities Finance Plan
- Appendix P.2 - Plan for Services
- Appendix Q - Service Letters & Responses
- Appendix R - City of San Diego Correspondence - DSD Engineering Division, Water and Sewer Section
- Appendix S - Sewer Study
- Appendix T - Water Analysis
- Appendix U - Waste Management Plan
Posted by Development Services Department
(University) 11011 Torreyana Road / PRJ – 1058759 / Subsequent Mitigated Negative Declaration / SCH No. 2019060003
- Subsequent Mitigated Negative Declaration
- Air Quality Technical Report
- Archaeological Resources Report
- Biological Technical Report
- Climate Action Plan Consistency Checklist
- Construction Noise Control Planning
- Geotechnical Investigation Report
- Hydrology and Hydraulics Study
- Phase I Environmental Site Assessment
- Traffic – Revised Local Mobility Analysis
- Traffic - WMT Analysis
- Waste Management Plan
Posted by Development Services Department
(University) 11011 Torreyana Road / PRJ – 1058759 / Subsequent Mitigated Negative Declaration / SCH No. 2019060003
- Subsequent Mitigated Negative Declaration
- Air Quality Technical Report
- Archaeological Resources Report
- Biological Technical Report
- Climate Action Plan Consistency Checklist
- Construction Noise Control Planning
- Geotechnical Investigation Report
- Hydrology and Hydraulics Study
- Phase I Environmental Site Assessment
- Traffic – Revised Local Mobility Analysis
- Traffic - WMT Analysis
- Waste Management Plan
Posted by Development Services Department
(Torrey Pines and University) Los Peñasquitos Lagoon Restoration Phase 1 / Project No. 697735 / Addendum / SCH No. 2017121036
- Addendum No. 697735
- Environmental Impact Report
- Design Plans
- Operation and Maintenance Plan
- Biological Technical Report
- Addendum to Biological Technical Report - Lagoon Marine Survey and Essential Fish Habitat Assessment
- Hydrologic and Hydraulic Report
- Hydrologic and Sediment Modeling for Freshwater Channels
- Water Quality and Hydrology Environmental Assessment Report
Posted by Engineering & Capital Projects
(Torrey Pines and University) Los Peñasquitos Lagoon Restoration Phase 1 / Project No. 697735 / Addendum / SCH No. 2017121036
- Addendum No. 697735
- Environmental Impact Report
- Design Plans
- Operation and Maintenance Plan
- Biological Technical Report
- Addendum to Biological Technical Report - Lagoon Marine Survey and Essential Fish Habitat Assessment
- Hydrologic and Hydraulic Report
- Hydrologic and Sediment Modeling for Freshwater Channels
- Water Quality and Hydrology Environmental Assessment Report
Posted by Engineering & Capital Projects
(North City Future Urbanizing Area (NCFUA) Framework Plan) El Camino Real Assisted Living Facility / Project No. 675732 / SCH No. 201371042
Subsequent Environmental Impact Report
Appendix A.1 - Notice of Preparation
Appendix A. 2 - Notice of Preparation Comment Letters
Appendix B - Phase I Environmental Site Assessment
Appendix C - Air Quality Modeling
Appendix D - Biological Technical Report
Appendix E - Climate Action Plan Consistency Checklist
Appendix F - Cultural Resources Inventory and Evaluation Report
Appendix G - Geotechnical Update and Storm Water Infiltration Study
Appendix H.1 - Access Analysis
Appendix L - Stormwater Quality Management Plan
Appendix M - Waste Management Plan
Appendix O - Fire Fuel Load Modeling Report
Appendix P - Construction Noise Avoidance Alternative Calculation Worksheets
Appendix Q - Emergency and Disaster Plan
Posted by Development Services Department
(North City Future Urbanizing Area (NCFUA) Framework Plan) El Camino Real Assisted Living Facility / Project No. 675732 / SCH No. 201371042
Subsequent Environmental Impact Report
Appendix A.1 - Notice of Preparation
Appendix A. 2 - Notice of Preparation Comment Letters
Appendix B - Phase I Environmental Site Assessment
Appendix C - Air Quality Modeling
Appendix D - Biological Technical Report
Appendix E - Climate Action Plan Consistency Checklist
Appendix F - Cultural Resources Inventory and Evaluation Report
Appendix G - Geotechnical Update and Storm Water Infiltration Study
Appendix H.1 - Access Analysis
Appendix L - Stormwater Quality Management Plan
Appendix M - Waste Management Plan
Appendix O - Fire Fuel Load Modeling Report
Appendix P - Construction Noise Avoidance Alternative Calculation Worksheets
Appendix Q - Emergency and Disaster Plan
Posted by Development Services Department
(North City Future Urbanizing Area) Via de la Valle Pipeline Replacement Project / WBS No. B-22015 / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(North City Future Urbanizing Area) Via de la Valle Pipeline Replacement Project / WBS No. B-22015 / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(Carmel Valley) 3060 Carmel Valley Road / PRJ – 1054862 / Addendum
- Addendum No. 1054862
- Negative Declaration No. 87-1054
- Climate Action Plan Consistency Checklist
- Drainage Study
- Geotechnical Investigation Report
- Noise Study
- Soils Management Plan
- Storm Water Quality Management Plan
- Traffic Study
Posted by Development Services Department
(Carmel Valley) 3060 Carmel Valley Road / PRJ – 1054862 / Addendum
- Addendum No. 1054862
- Negative Declaration No. 87-1054
- Climate Action Plan Consistency Checklist
- Drainage Study
- Geotechnical Investigation Report
- Noise Study
- Soils Management Plan
- Storm Water Quality Management Plan
- Traffic Study
Posted by Development Services Department
(Clairemont Mesa and Pacific Beach) Sewer & AC Water Group 1058 / WBS No. B-18193 (W), B-18191 (S) / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(Clairemont Mesa and Pacific Beach) Sewer & AC Water Group 1058 / WBS No. B-18193 (W), B-18191 (S) / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(Pacific Beach) Pacific Beach Improv 1 / WBS No. 19142 / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(Pacific Beach) Pacific Beach Improv 1 / WBS No. 19142 / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(Fairbanks Ranch Country Club) San Dieguito River Park Joint Powers Authority Osuna Segment of the Coast to Crest Trail / PRJ-1049410 / SCH No. 2023050120
- Final Mitigated Negative Declaration SCH No. 2023050120
- Mitigation Monitoring and Reporting Program
- Appendix A: Biological Technical Report
- Appendix B: Cultural Resource Inventory Report for the Osuna Trail
- Appendix C: Plan Sheets
- Appendix D: Foundation Report
- Appendix E: Hydrology Report
- Greenhouse Gas Emissions Consistency Memo
- Stormwater Requirements Applicability Checklist
- Stormwater Quality Management Plan
- Transportation Study Manual Project Information Form
Posted by Development Services Department
(Fairbanks Ranch Country Club) San Dieguito River Park Joint Powers Authority Osuna Segment of the Coast to Crest Trail / PRJ-1049410 / SCH No. 2023050120
- Final Mitigated Negative Declaration SCH No. 2023050120
- Mitigation Monitoring and Reporting Program
- Appendix A: Biological Technical Report
- Appendix B: Cultural Resource Inventory Report for the Osuna Trail
- Appendix C: Plan Sheets
- Appendix D: Foundation Report
- Appendix E: Hydrology Report
- Greenhouse Gas Emissions Consistency Memo
- Stormwater Requirements Applicability Checklist
- Stormwater Quality Management Plan
- Transportation Study Manual Project Information Form
Posted by Development Services Department