Data Date: October 1, 2021
This page contains all Capital Improvements Program (CIP) projects anticipated to be advertised and awarded for construction in the current fiscal year listed initially in the City'sAdopted CIP budget. This page is updated throughout the year with the current cost estimates and new projects to list. It also identifies which projects werealready awardedto a construction contractor. In addition, some projects from the original list may roll-over to the first quarter of next fiscal year and possibly beyond due to unforeseen conditions. SeeConstruction Contract Typesfor more information about delivery methods. Also, visitBid and Contract Opportunitiesfor projects currently in the bid and award phase For more information about this report, call (619) 533-4207 or emailengineering@sandiego.gov.
DOWNLOAD - Forecast of Projects to be Awarded in Fiscal Year 2022 (First Quarter Update)
Asummary by asset-managing departmentsis listed at the bottom of this page.
*To sort on a column, click on its heading. To sort on multiple columns, hold the Shift key while clicking.
Line Number | Project Name | Project Number | Asset Managing Department | Contract Type | Estimated Contract Cost ($) | Estimated Total Project Cost ($) | Fiscal Year Advertising | Quarter Advertising | Fiscal Year Awarding | Quarter Awarding |
---|---|---|---|---|---|---|---|---|---|---|
1 | Morena Conveyance Southern | B15141.4 | Public Utilities | Design Bid Build | $60,077,353 | $73,727,680 | FY22 | Q2 | FY22 | Q4 |
2 | Morena Conveyance Middle | B15141.3 | Public Utilities | Design Bid Build | $56,719,052 | $71,351,280 | FY22 | Q2 | FY22 | Q4 |
3 | Alvarado Trunk Sewer Phase IV | S15019 | Public Utilities | Design Bid Build | $54,300,000 | $66,999,999 | FY22 | Q2 | FY22 | Q4 |
4 | Organics Processing Facility | L17000.2 | Environmental Services | Design Build | $49,000,000 | $51,000,000 | FY22 | Q2 | FY22 | Q2 |
5 | MBC Equipment Upgrades | S17013 | Public Utilities | Design Bid Build | $37,187,541 | $47,645,193 | FY21 | Q3 | FY22 | Q1 |
6 | Morena Pipeline | S16027 | Public Utilities | Design Bid Build | $33,444,875 | $39,609,023 | FY22 | Q3 | FY22 | Q4 |
7 | Lakeside Valve Station Replacement | B17082 | Public Utilities | Design Bid Build | $24,151,559 | $36,207,782 | FY22 | Q3 | FY22 | Q4 |
8 | Harbor Drive Trunk Sewer | S18006 | Public Utilities | Design Bid Build | $19,400,000 | $26,500,000 | FY22 | Q1 | FY22 | Q2 |
9 | Fire-Rescue Air Ops Facility - PH II | S18007 | Fire-Rescue | Design Build | $18,536,212 | $22,481,000 | FY20 | Q2 | FY22 | Q2 |
10 | Pacific Highlands Ranch Branch Library | S14023 | Library Department | Design Bid Build | $17,902,982 | $26,164,178 | FY21 | Q1 | FY22 | Q2 |
11 | Balboa Park Botanical Bldg Improvements | S20005 | Parks & Recreation | Design Build | $14,261,647 | $21,453,000 | FY21 | Q2 | FY22 | Q1 |
12 | Maple Canyon Restoration - Phases 1 & 2 | B12040 | Stormwater | Design Bid Build | $13,363,157 | $16,876,997 | FY22 | Q3 | FY22 | Q4 |
13 | Kearny Mesa Facility Improvements | S20009 | Citywide | Design Bid Build | $13,214,699 | $14,772,123 | FY22 | Q2 | FY22 | Q3 |
14 | Tecolote Canyon Trunk Sewer Improvement | S15020 | Public Utilities | Design Bid Build | $12,847,000 | $17,130,000 | FY22 | Q2 | FY22 | Q3 |
15 | Otay 2nd Pipeline Phase 3 | B16158 | Public Utilities | Design Bid Build | $10,116,000 | $12,636,000 | FY22 | Q2 | FY22 | Q4 |
16 | PWP NCWRP Flow Equalization Basin | B21059 | Public Utilities | Design Bid Build | $9,733,500 | $12,915,481 | FY21 | Q4 | FY22 | Q2 |
17 | Asphalt Resurfacing Group 1901 | B18134 | Transportation | Design Bid Build | $9,571,046 | $10,486,046 | FY22 | Q2 | FY22 | Q2 |
18 | Water Group Job 952 | B11048 | Public Utilities | Design Bid Build | $9,408,992 | $11,148,173 | FY22 | Q2 | FY22 | Q4 |
19 | Alvarado TS Water Main Relocations | B18104 | Public Utilities | Design Bid Build | $9,403,562 | $10,438,400 | FY22 | Q2 | FY22 | Q4 |
20 | Miramar Reservoir Pump Station Improveme | B17190 | Public Utilities | Design Bid Build | $9,024,353 | $14,621,623 | FY22 | Q3 | FY22 | Q4 |
21 | AC Water & Sewer Group 1056 (W) | B18181 | Public Utilities | Design Bid Build | $8,466,401 | $10,976,801 | FY21 | Q3 | FY22 | Q1 |
22 | Hickman Fields Athletic Area | S00751 | Parks & Recreation | Design Bid Build | $8,200,001 | $10,566,319 | FY22 | Q2 | FY22 | Q3 |
23 | Asphalt Overlay Group 2110 | B21089 | Transportation | Design Bid Build | $7,384,901 | $9,060,525 | FY22 | Q3 | FY22 | Q4 |
24 | Sewer & AC Water Group 765A (W) | B18071 | Public Utilities | Design Bid Build | $7,018,230 | $9,260,223 | FY22 | Q2 | FY22 | Q4 |
25 | Sewer & AC Water Group 765A (S) | B18073 | Public Utilities | Design Bid Build | $7,018,230 | $9,232,230 | FY22 | Q2 | FY22 | Q4 |
26 | Wangenheim Joint Use Facility | S15007 | Parks & Recreation | Design Bid Build | $6,705,715 | $9,517,667 | FY21 | Q2 | FY22 | Q2 |
27 | Sidewalk Replacement Group 1902-Clmnt Mesa & LaJolla | B19013 | Transportation & Storm Water | Design Bid Build | $6,340,000 | $7,400,000 | FY22 | Q2 | FY22 | Q2 |
28 | University Ave Complete Street Phase 1 | S18001 | Transportation | Design Bid Build | $6,300,000 | $10,323,347 | FY22 | Q2 | FY22 | Q4 |
29 | Sewer & AC Water Group 794 (S) | B00395 | Public Utilities | Design Bid Build | $6,027,930 | $7,616,454 | FY22 | Q3 | FY22 | Q4 |
30 | Riviera Del Sol Neighborhood Park | S00999 | Parks & Recreation | Design Bid Build | $5,930,372 | $9,570,838 | FY22 | Q1 | FY22 | Q3 |
31 | Sewer and AC Water Group 793 (S) | B00394 | Public Utilities | Design Bid Build | $5,757,741 | $7,887,105 | FY22 | Q2 | FY22 | Q4 |
32 | Salk Neighborhood Park & Joint Use Devel | S14007 | Parks & Recreation | Design Bid Build | $5,577,278 | $7,237,278 | FY21 | Q1 | FY22 | Q2 |
33 | Clairemont Mesa E Improv 1 (W) | B18200 | Public Utilities | Design Bid Build | $5,207,998 | $7,367,648 | FY22 | Q1 | FY22 | Q3 |
34 | AC Water & Sewer Group 1050 (W) | B18090 | Public Utilities | Design Bid Build | $5,121,200 | $7,511,200 | FY22 | Q2 | FY22 | Q4 |
35 | AC Water & Sewer Group 1040 (W) | B18068 | Public Utilities | Design Bid Build | $5,050,700 | $7,539,300 | FY22 | Q3 | FY22 | Q4 |
36 | Accelerated Sewer Referral Group 851 | B19063 | Public Utilities | Design Bid Build | $4,900,773 | $6,217,408 | FY21 | Q3 | FY22 | Q4 |
37 | MBGC Clubhouse Demo/Prtbl Building Instl | S01090 | Parks & Recreation | Design Bid Build | $4,770,577 | $7,049,537 | FY21 | Q4 | FY22 | Q2 |
38 | AC Water & Sewer Group 1036 (W) | B18121 | Public Utilities | Design Bid Build | $4,730,597 | $5,000,000 | FY21 | Q4 | FY22 | Q2 |
39 | AC Water & Sewer Group 1052 (W) | B18092 | Public Utilities | Design Bid Build | $4,695,000 | $6,573,000 | FY22 | Q2 | FY22 | Q4 |
40 | AC Water & Sewer Group 1048 (S) | B18095 | Public Utilities | Design Bid Build | $4,537,800 | $6,655,500 | FY22 | Q3 | FY22 | Q4 |
41 | Rose Marie Starns Parking Lot Imprvemts | B19163 | Parks & Recreation | Design Bid Build | $4,227,000 | $6,200,000 | FY22 | Q3 | FY22 | Q4 |
42 | Scripps miramar Ranch library | S00811 | Library Department | Design Bid Build | $4,208,097 | $6,253,376 | FY21 | Q3 | FY22 | Q3 |
43 | MBGC Irrigation & Electrical Upgrades | S11010 | Parks & Recreation | Design Bid Build | $4,038,000 | $5,457,029 | FY21 | Q4 | FY22 | Q3 |
44 | University City Improv 1 (W) | B19086 | Public Utilities | Design Bid Build | $3,982,800 | $5,256,400 | FY22 | Q4 | FY22 | Q4 |
45 | Logan Heights LID (South) | B15051 | Stormwater | Design Bid Build | $3,705,000 | $5,700,000 | FY22 | Q2 | FY22 | Q4 |
46 | AC Water & Sewer Group 1052 (S) | B18096 | Public Utilities | Design Bid Build | $3,547,000 | $4,965,800 | FY22 | Q2 | FY22 | Q4 |
47 | University City Improv 1 (S) | B19087 | Public Utilities | Design Bid Build | $3,513,600 | $4,961,800 | FY22 | Q4 | FY22 | Q4 |
48 | Water & Sewer Group 965 (W) | B12057 | Public Utilities | Design Bid Build | $3,418,666 | $5,471,487 | FY22 | Q4 | FY22 | Q4 |
49 | STORM WATER DIVERSION AT THE PLWTP | B20001 | Public Utilities | Design Bid Build | $3,410,400 | $5,208,600 | FY22 | Q2 | FY22 | Q4 |
50 | Chollas Large Car Washes | L14002.3 | Fleet Services | Design Bid Build | $3,325,000 | $4,423,370 | FY22 | Q2 | FY22 | Q3 |
51 | Water & Sewer Group 965 (S) | B12048 | Public Utilities | Design Bid Build | $3,109,200 | $4,797,085 | FY22 | Q4 | FY22 | Q4 |
52 | Miramar Place CNG Facility Upgrades | B22041 | Environmental Services | Design Build | $3,100,000 | $3,700,000 | FY22 | Q3 | FY22 | Q4 |
53 | San Diego NC-MBC Improvements | B17006 | Public Utilities | Design Bid Build | $2,899,148 | $10,038,088 | FY21 | Q3 | FY22 | Q1 |
54 | Tierrasanta Improv 1 (s) | B21003 | Public Utilities | Design Bid Build | $2,830,000 | $3,590,000 | FY22 | Q2 | FY22 | Q4 |
55 | Bay Ho Improv 3 (W) | B19134 | Public Utilities | Design Build | $2,820,200 | $3,869,500 | FY23 | Q2 | FY22 | Q4 |
56 | Clairemont Mesa E Improv 1 (S) | B18202 | Public Utilities | Design Bid Build | $2,751,128 | $4,178,097 | FY22 | Q1 | FY22 | Q3 |
57 | College Areas Swr & AC Wtr Main Repl (S) | B16025 | Public Utilities | Design Bid Build | $2,699,372 | $3,761,497 | FY22 | Q2 | FY22 | Q4 |
58 | Miramar Reservoir PS New Generator & Upg | B19099 | Public Utilities | Design Bid Build | $2,660,874 | $4,235,874 | FY22 | Q3 | FY22 | Q4 |
59 | Bannock Ave Streetscape Enhancements | B10027 | Stormwater | Design Bid Build | $2,648,225 | $4,121,788 | FY22 | Q2 | FY22 | Q4 |
60 | Storm Water Diversion At The SBWRP | B20002 | Public Utilities | Design Bid Build | $2,537,900 | $3,908,100 | FY22 | Q3 | FY22 | Q4 |
61 | Penasquitos Pump Stn Oxygenation System | B21001 | Public Utilities | Design Bid Build | $2,458,357 | $3,482,591 | FY22 | Q3 | FY22 | Q4 |
62 | AC Water & Sewer Group 1050 (S) | B18094 | Public Utilities | Design Bid Build | $2,346,300 | $3,441,200 | FY22 | Q2 | FY22 | Q4 |
63 | Kensington Hts #2 Series Circuit Upgrade | B17146 | Transportation & Storm Water | Design Bid Build | $2,321,000 | $2,800,000 | FY22 | Q3 | FY22 | Q4 |
64 | Scripps Ranch Improv 1 (W) | B18208 | Public Utilities | Design Bid Build | $2,313,800 | $3,517,000 | FY22 | Q3 | FY22 | Q4 |
65 | PD Substation Small Carwashes | L14002.6 | Fleet Services | Design Bid Build | $2,200,000 | $3,488,516 | FY22 | Q2 | FY22 | Q4 |
66 | Mission Ctr Cnyn A SMR | B00431 | Public Utilities | Design Bid Build | $2,164,500 | $3,188,600 | FY22 | Q2 | FY22 | Q4 |
67 | EMTS Boat Dock Esplanade | S00319 | Public Utilities | Design Bid Build | $2,160,380 | $3,430,851 | FY20 | Q4 | FY22 | Q3 |
68 | Olive St Park Acquisition and Develpment | S10051 | Parks & Recreation | Design Bid Build | $2,094,200 | $5,171,585 | FY21 | Q1 | FY22 | Q2 |
69 | Scripps Ranch Improv 1 (S) | B18204 | Public Utilities | Design Bid Build | $2,035,300 | $3,052,500 | FY22 | Q3 | FY22 | Q4 |
70 | AC Water and Sewer Group 1023B (W) | B19205 | Public Utilities | Design Bid Build | $2,000,000 | $2,941,000 | FY22 | Q2 | FY22 | Q4 |
71 | Foothill Blvd & Loring St Roundabout | B18008 | Transportation | Design Bid Build | $1,864,775 | $2,859,700 | FY22 | Q2 | FY22 | Q4 |
72 | John F. Kennedy Neighborhood Park Improvements | B18005 | Parks & Recreation | Design Bid Build | $1,859,668 | $3,552,774 | FY22 | Q2 | FY22 | Q4 |
73 | Bermuda Ave Coastal Access Replacement | B17110 | Parks & Recreation | Design Bid Build | $1,792,528 | $3,050,528 | FY22 | Q2 | FY22 | Q2 |
74 | Balboa Park Federal Bldg Improvements | B20066 | Parks & Recreation | Design Bid Build | $1,741,000 | $2,793,000 | FY22 | Q1 | FY22 | Q3 |
75 | Morena Improv 3 (W) | B21056 | Public Utilities | Job Order Contract | $1,707,775 | $1,754,175 | FY21 | Q4 | FY22 | Q2 |
76 | North Park Mini Park Ped Improvements | B17102 | Transportation & Storm Water | Design Bid Build | $1,699,900 | $2,844,167 | FY22 | Q2 | FY22 | Q4 |
77 | Highland & Monroe Aves Storm Drain Repl | B12096 | Stormwater | Design Bid Build | $1,586,000 | $3,276,516 | FY22 | Q2 | FY22 | Q4 |
78 | AC Water & Sewer Group 1040 (S) | B18066 | Public Utilities | Design Bid Build | $1,568,500 | $2,278,800 | FY22 | Q3 | FY22 | Q4 |
79 | Torrey Pines Gf-Repr Storm Drain Outfall | B17152 | Stormwater | Design Bid Build | $1,540,000 | $3,360,000 | FY22 | Q2 | FY22 | Q3 |
80 | Curb Ramp Improvement Group 1701 | B17114 | Transportation & Storm Water | Design Bid Build | $1,500,000 | $3,425,000 | FY22 | Q2 | FY22 | Q4 |
81 | Crown Point Playground Improvements | B19021 | Parks & Recreation | Design Bid Build | $1,464,516 | $2,330,000 | FY22 | Q1 | FY22 | Q4 |
82 | AC Water & Sewer Group 1036 (S) | B18123 | Public Utilities | Design Bid Build | $1,456,393 | $2,000,000 | FY21 | Q4 | FY22 | Q2 |
83 | Santa Clara Playground Improvements | B19029 | Parks & Recreation | Design Bid Build | $1,377,009 | $2,109,500 | FY21 | Q4 | FY22 | Q2 |
84 | Canon Street Pocket Park | S16047 | Parks & Recreation | Design Bid Build | $1,374,350 | $2,867,315 | FY22 | Q2 | FY22 | Q3 |
85 | Talmadge AC Water Main Replacement | B18197 | Public Utilities | Design Bid Build | $1,317,345 | $2,001,660 | FY21 | Q3 | FY22 | Q1 |
86 | Miramar Place Repair Shop Upgrades | TBD4 | Environmental Services | Design Bid Build | $1,286,000 | $1,500,000 | FY22 | Q3 | FY22 | Q3 |
87 | Sidewalk Replacement Group 1903-SE & CH | B19014 | Transportation & Storm Water | Design Bid Build | $1,240,000 | $1,809,007 | FY22 | Q2 | FY22 | Q2 |
88 | AC Water & Sewer Group 1048 (W) | B18088 | Public Utilities | Design Bid Build | $1,231,700 | $1,806,500 | FY22 | Q3 | FY22 | Q4 |
89 | Ocean Air CP Comfort Station & Park Impr | S16031 | Parks & Recreation | Design Bid Build | $1,223,021 | $2,181,793 | FY22 | Q3 | FY22 | Q4 |
90 | NCWRP - Chiller Replacement | B20148 | Public Utilities | Design Bid Build | $1,186,900 | $1,613,600 | FY22 | Q2 | FY22 | Q4 |
91 | Green Infrastructure Group 1027 | B15103 | Stormwater | Design Bid Build | $1,180,190 | $2,000,000 | FY22 | Q3 | FY22 | Q4 |
92 | North Cove Comfort Station Imp | B18234 | Parks & Recreation | Design Bid Build | $1,177,918 | $2,099,584 | FY22 | Q2 | FY22 | Q4 |
93 | Sewer & AC Water Group 794 (W) | B16041 | Public Utilities | Design Bid Build | $1,147,000 | $1,428,000 | FY22 | Q3 | FY22 | Q4 |
94 | Crown Point Parking Lot Improvements | B19022 | Parks & Recreation | Design Bid Build | $1,104,516 | $1,772,000 | FY22 | Q1 | FY22 | Q4 |
95 | Cajon Way CMP Storm Drain Emergency | B21115 | Stormwater | Emergency (As-needed) | $1,100,000 | $1,750,000 | FY21 | Q3 | FY22 | Q1 |
96 | Hard Court Improvements | B22045 | Parks & Recreation | To Be Determined | $1,070,000 | $1,070,000 | FY22 | Q2 | FY22 | Q4 |
97 | Sewer and AC Water Group 793 (W) | B15070 | Public Utilities | Design Bid Build | $1,046,400 | $1,779,200 | FY22 | Q2 | FY22 | Q4 |
98 | Accelerated MH Referral Group 1 | B19097 | Public Utilities | Design Bid Build | $1,026,647 | $2,047,033 | FY21 | Q3 | FY22 | Q2 |
99 | MLK Rec Center Moisture Intrusion | B19001 | Parks & Recreation | Design Bid Build | $1,020,093 | $2,515,168 | FY21 | Q1 | FY22 | Q2 |
100 | Dusty Rhodes Comfort Station Improvement | B19180 | Parks & Recreation | Design Bid Build | $1,015,640 | $1,944,000 | FY22 | Q2 | FY22 | Q4 |
101 | Dusty Rhodes Playground | B19181 | Parks & Recreation | Design Bid Build | $1,015,640 | $1,944,000 | FY22 | Q2 | FY22 | Q4 |
102 | Plumosa Park Series Circuit Conversion | B17101 | Transportation & Storm Water | Job Order Contract | $976,000 | $1,450,000 | FY22 | Q2 | FY22 | Q4 |
103 | Southeastern Mini Park Improvements- Clay Avenue Mini Park | L16000.5 | Parks & Recreation Department | Design Bid Build | $943,910 | $1,857,152 | FY20 | Q1 | FY22 | Q4 |
104 | Miramar Trailer for new office space needs LF Ops | L17000.6 | Environmental Services | Design Build | $900,000 | $1,000,000 | FY22 | Q3 | FY22 | Q4 |
105 | AC Water Group 1027A | B21055 | Public Utilities | Design Build | $900,000 | $1,200,000 | FY22 | Q3 | FY22 | Q4 |
106 | College Areas Swr & AC Wtr Main Repl (W) | B16022 | Public Utilities | Design Bid Build | $896,284 | $1,414,184 | FY22 | Q2 | FY22 | Q4 |
107 | El Cajon Bl-Highland-58th Improv | B17003 | Transportation & Storm Water | Design Bid Build | $885,305 | $1,380,000 | FY21 | Q4 | FY22 | Q2 |
108 | MYF Electrical System Upgrade | B18034 | Airports Department | Design Bid Build | $864,846 | $1,270,062 | FY22 | Q2 | FY22 | Q3 |
109 | Damon Ave Water Main Extension & AC Repl | B18215 | Public Utilities | Design Bid Build | $786,859 | $1,465,059 | FY22 | Q2 | FY22 | Q3 |
110 | Mid-City & Eastern Area Signal Mods | B17128 | Transportation & Storm Water | Design Bid Build | $781,030 | $1,236,626 | FY22 | Q3 | FY22 | Q4 |
111 | Torrey Highlands Neighborhood Park Upgra | S16036 | Parks & Recreation | Design Bid Build | $690,000 | $1,057,937 | FY20 | Q2 | FY22 | Q3 |
112 | Morena Improv 3 (S) | B21064 | Public Utilities | Job Order Contract | $610,162 | $648,862 | FY21 | Q4 | FY22 | Q2 |
113 | DeAnza North Parking Lot Improvements | B18220 | Parks & Recreation | Design Bid Build | $579,000 | $1,133,192 | FY22 | Q3 | FY22 | Q3 |
114 | Catalina Blvd TS Interconnect Upgrade | B21118 | Transportation | Design Bid Build | $562,000 | $873,140 | FY21 | Q4 | FY22 | Q3 |
115 | Kearny Mesa Pipeline Manway | B20072 | Public Utilities | Job Order Contract | $560,000 | $889,000 | FY22 | Q2 | FY22 | Q3 |
116 | Mountain View Sports Courts | B18192 | Parks & Recreation | Job Order Contract | $546,000 | $1,555,000 | FY22 | Q2 | FY22 | Q2 |
117 | Miramar Valves Replacement | B20015 | Public Utilities | Design Bid Build | $525,000 | $859,000 | FY22 | Q2 | FY22 | Q3 |
118 | Santa Clara Comfort Station Improvements | B19032 | Parks & Recreation | Design Bid Build | $506,137 | $1,409,500 | FY21 | Q4 | FY22 | Q2 |
119 | Citywide Street Lights Group 1702 | B17051 | Transportation & Storm Water | Design Bid Build | $458,844 | $749,144 | FY22 | Q3 | FY22 | Q4 |
120 | Mountain View Improv 1 (S) | B20149 | Public Utilities | Job Order Contract | $453,800 | $720,799 | FY22 | Q2 | FY22 | Q4 |
121 | Tecolote Cyn GC Water Conn | B15203 | Public Utilities | Design Bid Build | $450,000 | $525,500 | FY21 | Q3 | FY22 | Q4 |
122 | Howard Avenue- Village Pine to iris Avenue Sidewalk | B18019 | Transportation & Storm Water | Design Bid Build | $435,000 | $1,053,400 | FY22 | Q2 | FY22 | Q4 |
123 | Chollas Lake Electrical Upgrade | L18001.1 | Parks & Recreation Department | Design Bid Build | $424,000 | $850,000 | FY22 | Q2 | FY22 | Q2 |
124 | Citywide Street Lights Group 1701 | B17050 | Transportation & Storm Water | Design Bid Build | $419,500 | $705,600 | FY22 | Q3 | FY22 | Q4 |
125 | Adams Avenue (1620) Storm Drain Replacement | B13102 | Stormwater | Design Bid Build | $391,000 | $1,751,933 | FY22 | Q1 | FY22 | Q3 |
126 | AC Water & Sewer Group 1056 (S) | B18182 | Public Utilities | Design Bid Build | $368,705 | $428,605 | FY21 | Q3 | FY22 | Q1 |
127 | Dusty Rhodes Parking Lot Improvements | B19158 | Parks & Recreation | Design Bid Build | $338,720 | $642,000 | FY22 | Q2 | FY22 | Q4 |
128 | Soledad Pressure Reducing Stn Hatch (w) | B21040 | Public Utilities | Design Bid Build | $325,000 | $500,000 | FY22 | Q3 | FY22 | Q4 |
129 | Governor Dr @ Lakewood St Traffic Signal | B17016 | Transportation & Storm Water | Design Bid Build | $306,925 | $589,859 | FY21 | Q4 | FY22 | Q2 |
130 | Chollas Paint Booth | L14002.5 | Fleet Services | Design Bid Build | $303,000 | $666,000 | FY21 | Q2 | FY22 | Q2 |
131 | Reo Drive New Streetlights | B19079 | Transportation & Storm Water | Design Bid Build | $287,500 | $428,300 | FY22 | Q3 | FY22 | Q4 |
132 | Kettner & Palm Pedestrian Hybrid Beacon | B18046 | Transportation & Storm Water | Job Order Contract | $275,100 | $481,400 | FY21 | Q3 | FY22 | Q4 |
133 | 73rd St-El Cajon Bl to Saranac-Sidewalk | B18017 | Transportation & Storm Water | Design Bid Build | $275,000 | $651,750 | FY22 | Q2 | FY22 | Q4 |
134 | Point Loma Library Chiller Replacement | B19203 | Library Department | Job Order Contract | $252,756 | $560,000 | FY21 | Q3 | FY22 | Q2 |
135 | El Cajon Blvd (Highland Ave - Chamoune Ave) streetlights | B21065 | Transportation | Design Bid Build | $250,000 | $300,000 | FY21 | Q4 | FY22 | Q2 |
136 | Marlesta/Beagle (Gen-B/M-Ashf) SL UU465 | B18127 | Transportation | Design Bid Build | $211,000 | $350,000 | FY22 | Q2 | FY22 | Q3 |
137 | AC Water and Sewer Group 1023B (S) | B19204 | Public Utilities | Design Bid Build | $200,000 | $326,000 | FY22 | Q2 | FY22 | Q4 |
138 | Palm Avenue Storm Drain Replacement | B17163 | Stormwater | Job Order Contract | $190,869 | $564,208 | FY22 | Q1 | FY22 | Q2 |
139 | Miramar Landfill Fee Booth Truck Scale #3 Replacement | TBD5 | Environmental Services | Sole Source | $190,000 | $220,000 | FY22 | Q3 | FY22 | Q3 |
140 | Miramar Landfill Outbound Scale #5 Replacement | TBD6 | Environmental Services | Sole Source | $190,000 | $220,000 | FY22 | Q3 | FY22 | Q3 |
141 | Talmadge Traffic Calming Infrastructure | S17001 | Parks & Recreation | Design Bid Build | $178,100 | $338,964 | FY21 | Q3 | FY22 | Q1 |
142 | Linda Vista Skate Park Phase 2 | B19062 | Parks & Recreation | Job Order Contract | $168,539 | $429,769 | FY21 | Q4 | FY22 | Q2 |
143 | Citywide Street Lights Group 1801 | B18012 | Transportation & Storm Water | Design Bid Build | $162,762 | $250,000 | FY22 | Q3 | FY22 | Q4 |
144 | Storm Drain Group 968 | B15028 | Stormwater | Design Bid Build | $156,810 | $296,757 | FY20 | Q3 | FY22 | Q2 |
145 | Regional Arterial Guardrail Group 2a | B18201 | Transportation | Design Bid Build | $142,000 | $311,500 | FY22 | Q2 | FY22 | Q4 |
146 | Redwood St (Pershing-Boundary) SL UU611 | B20095 | Transportation | Design Bid Build | $122,800 | $252,000 | FY21 | Q4 | FY22 | Q4 |
147 | Mt Acadia (Mt Alifan-Mt Burnham)SL UU621 | B17012 | Transportation | Job Order Contract | $109,631 | $202,431 | FY21 | Q4 | FY22 | Q2 |
148 | Otay WTP-Basin #1 Concrete Restoration | B17092 | Public Utilities | Design Bid Build | $75,000 | $3,576,645 | FY20 | Q4 | FY22 | Q3 |
149 | Alvarado WTP Basins Baffle Wall Doors | B21054 | Public Utilities | Job Order Contract | $66,700 | $130,800 | FY22 | Q3 | FY22 | Q4 |
150 | AC Water & Sewer Group 1056 (BL) | B21136 | TSW | Design Bid Build | $64,000 | $64,000 | FY21 | Q3 | FY22 | Q1 |
151 | Balboa Park Golf Course - Bathroom Remod | B20064 | Parks & Recreation | Job Order Contract | $62,000 | $189,000 | FY22 | Q2 | FY22 | Q4 |
152 | Cchavez Pkwy (I5-Comml) UU27 | B21092 | Transportation & Storm Water | Job Order Contract | $60,000 | $150,000 | FY21 | Q4 | FY22 | Q3 |
153 | Citywide Street Lights 1950 | B19125 | Transportation & Storm Water | Job Order Contract | $54,000 | $2,600,000 | FY22 | Q2 | FY22 | Q2 |
154 | Kellogg Comfort Station Improvements | B20120 | Real Estate Assets - Facilities | Job Order Contract | $52,000 | $126,000 | FY22 | Q2 | FY22 | Q4 |
155 | ADA Torrey Pines APS PROW-S25 | B18061 | Transportation & Storm Water | Design Bid Build | $25,900 | $359,600 | FY22 | Q3 | FY22 | Q4 |
Summary By Asset-Managing Departments
Asset-Managing Department | Estimated Construction Contract Award | Estimated Total Project Cost |
---|---|---|
Airports Department | $864,846 | $1,270,062 |
Library Department | $22,363,835 | $32,977,554 |
Parks & Recreation Department | $1,367,910 | $2,707,152 |
Transportation & Storm Water | $18,503,766 | $30,363,853 |
TSW | $64,000 | $64,000 |
Fleet Services | $5,828,000 | $8,577,886 |
Parks & Recreation | $76,109,185 | $119,208,278 |
Public Utilities | $487,911,481 | $649,456,995 |
Fire-Rescue | $18,536,212 | $22,481,000 |
Citywide | $13,214,699 | $14,772,123 |
Environmental Services | $54,666,000 | $57,640,000 |
Stormwater | $25,861,251 | $39,698,198 |
Transportation | $26,518,153 | $35,018,689 |
Real Estate Assets - Facilities | $52,000 | $126,000 |
FY 2022 Total | $751,861,339 | $1,014,361,791 |
*Estimated Advertise and Award Dates for Pure Water projects are to be determined
Archive of Anticipated CIP Projects
Forecast of Projects to be Awarded in Fiscal Year 2024
- Forecast of Projects to be Awarded in Fiscal Year 2024 (Third Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2024 (Mid-Year Update)
- Forecast of Projects to be Awarded in Fiscal Year 2024 (First Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2024 (Adopted Budget)
- Forecast of Projects to be Awarded in Fiscal Year 2024 (Proposed Budget)
Forecast of Projects to be Awarded in Fiscal Year 2023
- Forecast of Projects to be Awarded in Fiscal Year 2023 (Third Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2023 (Mid-Year Update)
- Forecast of Projects to be Awarded in Fiscal Year 2023 (First Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2023 (Adopted Budget)
- Forecast of Projects to be Awarded in Fiscal Year 2023 (Proposed Budget)
Forecast of Projects to be Awarded in Fiscal Year 2022
- Forecast of Projects to be Awarded in Fiscal Year 2022 (Third Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2022 (Mid-Year Update)
- Forecast of Projects to be Awarded in Fiscal Year 2022 (First Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2022 (Adopted Budget)
- Forecast of Projects to be Awarded in Fiscal Year 2022 (Proposed Budget)
Forecast of Projects to be Awarded in Fiscal Year 2021
- Forecast of Projects to be Awarded in Fiscal Year 2021 (Third Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2021 (Mid-Year Update)
- Forecast of Projects to be Awarded in Fiscal Year 2021 (First Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2021 (Adopted Budget)
- Forecast of Projects to be Awarded in Fiscal Year 2021 (Proposed Budget)
Forecast of Projects to be Awarded in Fiscal Year 2016
- Forecast of Projects to be Awarded in Fiscal Year 2016 (Third Quarter Update) as of 4/1/2016
- Forecast of Projects to be Awarded in Fiscal Year 2016 (Second Quarter Update) as of 1/1/2016
- Forecast of Projects to be Awarded in Fiscal Year 2016 (First Quarter Update) as of 10/1/2015
- Forecast of Projects to be Awarded in Fiscal Year 2016 as of 07/1/2015