Data Date: Feb 1, 2020

To create the print version set the font-size:0.5em on both tables. Save as PDF in Chrome; More Settings - Margins:None and Scale:85. Also change link on https://www.sandiego.gov/cip/reports to match the year if starting with quarter 1.

This page contains all Capital Improvements Program (CIP) projects anticipated to be advertised and awarded for construction in the current fiscal year listed initially in the City'sAdopted CIP budget. This page is updated throughout the year with the current cost estimates and new projects to list. It also identifies which projects werealready awardedto a construction contractor. In addition, some projects from the original list may roll-over to the first quarter of next fiscal year and possibly beyond due to unforeseen conditions. SeeConstruction Contract Typesfor more information about delivery methods. Also, visitBid and Contract Opportunitiesfor projects currently in the bid and award phase For more information about this report, call (619) 533-4207 or emailengineering@sandiego.gov.

PDF icon PRINT - Forecast of Projects to be Awarded Fiscal Year 2020 (Mid-Year Update)

File DOWNLOAD - Forecast of Projects to be Awarded Fiscal Year 2020 (Mid-Year Update)

Asummary by asset-managing departmentsis listed at the bottom of this page.

*To sort on a column, click on its heading. To sort on multiple columns, hold the Shift key while clicking.

Line
Number
Project
Name
Project
Number
Asset Managing
Department
Contract
Type
Estimated
Contract
Cost ($)
Estimated
Total Project
Cost ($)
Fiscal Year
Advertising
Quarter
Advertising
Fiscal Year
Awarding
Quarter
Awarding
1Block 8R UUP21003599Transportation and Storm Water Department - Street DivisionDesign Bid Build$7,930,000$10,705,500FY20Q2FY20Q4
2Sewer and AC Water Group 765 (S)B00369PUD SewerDesign Bid Build$2,361,198$3,347,432FY20Q3FY20Q4
3SEWER GJ 798CB00409PUD SewerDesign Bid Build$212,420$484,380FY20Q4FY20Q4
4Fanuel St PI Archer to Tourmaline UUDB00721TSWJob Order Contract$90,344$142,047FY20Q3FY20Q4
5District 1 Block 1-J UUDB00836TSWJob Order Contract$422,809$521,809FY20Q3FY20Q4
6SD Mission Rd w/o Fairmount Av Sdwk S/SB13130TSWDesign Bid Build$832,776$1,330,576FY20Q3FY20Q4
7Block 8C UUD (Greater Golden Hill)B13155TSWJob Order Contract$480,000$680,000FY20Q4FY20Q4
8Water Group 968B14099PUD WaterDesign Bid Build$2,152,300$3,182,500FY20Q3FY20Q4
9Storm Drain Group 968B15028Transportation and Storm Water Department - Storm Water DivisionDesign Bid Build$131,000$281,000FY20Q3FY20Q4
10Block 6H UUPB15086TSWJob Order Contract$450,000$623,000FY20Q3FY20Q4
11Baker St/Shawnee Rd UUP (Morena to ShawnB15090TSWJob Order Contract$120,000$168,000FY20Q3FY20Q4
12Seminole Drive UUP (Stanley to Estelle)B15093TSWDesign Bid Build$38,250$45,000FY20Q3FY20Q4
13Block 8R UUP - CIPB15097Transportation and Storm Water Department - Street DivisionDesign Bid Build$1,000,000$1,350,000FY20Q2FY20Q4
14AC Water & Sewer Group 1023 (S)B15117PUD SewerDesign Bid Build$465,000$783,060FY20Q3FY20Q4
15AC Water & Sewer Group 1023 (W)B15120PUD WaterDesign Bid Build$4,000,512$6,007,874FY20Q3FY20Q4
16NCWRP Expansion (Pkg. 1)B15142.1Public UtilitiesDesign Bid Build$12,313,000$9,734,000FY19Q4FY20Q4
17Nimitz Bridge at NTC RehabilitationB15198TSWDesign Bid Build$348,500$838,100FY20Q3FY20Q4
18Remaining Small Diameter CI Water Ph2B16023PUD WaterDesign Bid Build$7,779,750$11,312,800FY20Q1FY20Q4
19Sewer Group 776AB16034PUD SewerDesign Bid Build$4,146,514$5,771,976FY20Q3FY20Q4
20ADA S/W Group 4E CollegeB16107Development Services DepartmentDesign Bid Build$755,000$1,181,899FY20Q3FY20Q4
21ADA Curb Ramp Winder & McKeeB16108ADA Compliance & AccessibilityDesign Bid Build$360,300$805,000FY20Q3FY20Q4
22Adams Ave & 49th St Splitter IslandsB17025Transportation and Storm Water Department - Street DivisionDesign Bid Build$294,600$871,500FY20Q2FY20Q4
23Fanuel St III (Grand-PB Dr) Rd Imp UU188B17071Street DivisionDesign Bid Build$106,912$144,329FY20Q3FY20Q4
24Remaining Small Diameter CI Water Ph 3B17091PUD WaterDesign Bid Build$3,655,000$5,190,000FY20Q3FY20Q4
25San Vicente PH I-II Rd Imp UU505-UU506B17098Street DivisionDesign Bid Build$359,483$485,302FY20Q3FY20Q4
26India St at West Palm St Hybrid BeaconB17100TSWDesign Bid Build$237,500$395,400FY20Q4FY20Q4
27Plumosa Park Series Circuit ConversionB17101TSWJob Order Contract$765,000$1,100,000FY20Q4FY20Q4
28Sewer & AC Water Group 1032 (S)B17104PUD SewerDesign Bid Build$6,389,000$8,518,000FY20Q3FY20Q4
29Sewer & AC Water Group 1032 (W)B17105PUD SewerDesign Bid Build$7,071,000$9,428,000FY20Q3FY20Q4
30Abbot Street Series CircuitB17145TSWDesign Bid Build$275,000$422,500FY20Q4FY20Q4
31Regional Arterial Guardrail Group 2B17155TSWJob Order Contract$256,612$381,800FY20Q4FY20Q4
32Sewer and AC Water Group 765 (W)B17167PUD WaterDesign Bid Build$2,841,406$3,771,728FY20Q3FY20Q4
33Mission Beach Water & Sewer Repl (W)B17169PUD WaterDesign Bid Build$10,541,818$13,142,734FY20Q3FY20Q4
34Mission Beach Water & Sewer Repl (S)B17170PUD SewerDesign Bid Build$1,578,150$2,025,350FY20Q3FY20Q4
35Canyonside CP AC SystemB17172Parks & Recreation DepartmentDesign Bid Build$550,000$1,115,000FY20Q3FY20Q4
36Water Group 970 CIB18075PUD WaterDesign Bid Build$6,154,700$9,970,645FY20Q2FY20Q4
37AC Water & Sewer Group 1053 (W)B18093PUD WaterMultiple Award Construction Contract$5,384,300$6,443,300FY20Q2FY20Q4
38AC Water & Sewer Group 1053 (S)B18099PUD SewerMultiple Award Construction Contract$4,821,300$5,523,300FY20Q3FY20Q4
39Alvarado TS Water Main RelocationsB18104PUD WaterDesign Bid Build$10,000,000$10,438,400FY20Q3FY20Q4
40Howard PHI-II(Park-Texas) Rd Imp UU71-72B18136Street DivisionDesign Bid Build$190,910$257,729FY20Q3FY20Q4
41Wightman (Chamoune -Euclid) Rd Imp UU388B18138Street DivisionDesign Bid Build$123,367$166,546FY20Q3FY20Q4
42Mission Bl(Loring-Turquoise) Rd Imp UU30B18140Street DivisionDesign Bid Build$170,777$230,549FY20Q3FY20Q4
43Golfcrest(Jackson-Wandermere)Rd ImpUU584B18149Street DivisionDesign Bid Build$221,988$299,684FY20Q3FY20Q4
44Hilltop PH I(Boundary-Toyne)Rd Imp UU617B18153Street DivisionDesign Bid Build$235,392$317,779FY20Q3FY20Q4
45Accelerated Pipeline Rehab Ref Group 846B18185PUD SewerDesign Bid Build$1,005,500$1,226,200FY20Q4FY20Q4
46PIPELINE REHABILITATION AX-1B18203PUD SewerDesign Bid Build$4,754,000$5,798,000FY20Q3FY20Q4
47SP17 JOC North Task 1 - Scripps Poway ParkwayB19007.1TSWJob Order Contract$5,000,000$5,500,000FY19Q4FY20Q4
48SP17 JOC South Task 1 - Fairmount Ave/MontezumaB19008.1TSWJob Order Contract$5,000,000$5,500,000FY19Q4FY20Q4
49Sidewalk Replacement Group 1901-NP & OBB19012TSWDesign Bid Build$1,450,000$1,643,216FY20Q3FY20Q4
50Rancho Penasquitos Improv 1(W)B19093PUD WaterMultiple Award Construction Contract$5,835,800$7,179,840FY20Q2FY20Q4
51Downtown Complete St Impl Phase 2B19143TSWDesign Bid Build$2,500,000$3,375,000FY20Q3FY20Q4
52Rosecrans Street Median ImprovementsB19165Transportation and Storm Water Department - Street DivisionDesign Bid Build$554,000$911,000FY20Q3FY20Q4
53Bay Ho Improv 2A (W)B19202PUD WaterDesign Bid Build$1,870,170$3,080,300FY20Q3FY20Q4
54Gamma Street Mini-Park ADA ImprovementsL16000.1Parks & Recreation DepartmentDesign Bid Build$607,649$1,488,291FY20Q1FY20Q4
55Island Ave Mini Park ImprovementsL16000.2Parks & Recreation DepartmentDesign Bid Build$1,135,000$2,231,850FY20Q2FY20Q4
56J Street Mini Park ImprovementL16000.6Parks & Recreation DepartmentDesign Bid Build$546,000$1,171,670FY20Q1FY20Q4
57La Jolla Village/I-805 Landscape MaintS15017Transportation and Storm Water Department - Storm Water DivisionDesign Bid Build$385,000$550,000FY20Q4FY20Q4
58Alvarado Trunk Sewer Phase IVS15019PUD SewerDesign Bid Build$55,000,000$67,000,000FY20Q3FY20Q4
59Villa Monserate Neigh Park UpgradesS16048Parks & Recreation DepartmentDesign Bid Build$887,184$1,707,221FY20Q2FY20Q4
60Balboa Pk Bud Kearns Aquatic Complex ImpS17000Parks & Recreation DepartmentDesign Bid Build$2,241,187$3,294,000FY20Q2FY20Q4
61Ashley Falls Lg Scale Storm Flow StorageB14007Transportation and Storm Water Department - Storm Water DivisionDesign Bid Build$761,567$1,649,832FY19Q3FY20Q1
62Sidewalk Replacement Group 1604B16030TSWDesign Bid Build$820,594$1,390,210FY19Q4FY20Q1
63Cass St (Grand-Pacific) SL UU143B17007TSWJob Order Contract$64,800$72,000FY20Q1FY20Q1
64Manzana Storm Drain ReplacementB17079Transportation and Storm Water Department - Storm Water DivisionDesign Bid Build$853,000$1,250,000FY20Q1FY20Q1
65San Diego Central Library-Boiler ReplacB17103Library DepartmentJob Order Contract$1,003,000$1,810,166FY19Q4FY20Q1
66Pipeline Rehabilitation AQ-1B17151PUD SewerDesign Bid Build$4,209,510$5,497,986FY19Q4FY20Q1
67Ultraviolet Disinfection System ReplaceB18031PUD SewerDesign Bid Build$3,391,636$4,544,156FY19Q3FY20Q1
68Manzana Water ReplacementB18109PUD WaterDesign Bid Build$660,000$928,995FY19Q3FY20Q1
69Hotel Circle CI & AC Accelerated ReplB18235PUD WaterDesign Bid Build$2,555,262$3,580,844FY19Q4FY20Q1
70MOUNTAIN VIEW ACCELERATED (W)B19075PUD WaterJob Order Contract$859,500$1,106,500FY20Q1FY20Q1
71MOUNTAIN VIEW ACCELERATED (S)B19076PUD SewerJob Order Contract$411,100$529,200FY20Q1FY20Q1
7230th Street Pipeline Replacement AB19100PUD WaterJob Order Contract$2,005,614$3,005,290FY19Q4FY20Q1
736500 Montezuma Rd SD EmergencyB19126Transportation and Storm Water Department - Storm Water DivisionSole Source Emergency Project$5,500,000$5,900,000FY19Q3FY20Q1
747980 Park Village Rd SD EmergencyB19127Transportation and Storm Water Department - Storm Water DivisionSole Source Emergency Project$3,000,000$3,900,000FY19Q3FY20Q1
754196 Rochester Rd SD EmergencyB19131Transportation and Storm Water Department - Storm Water DivisionSole Source Emergency Project$1,707,000$2,900,000FY19Q3FY20Q1
7612362 Springhurst Dr. SD EmergencyB19146Transportation and Storm Water Department - Street DivisionSole Source Emergency Project$1,000,000$1,700,000FY19Q3FY20Q1
77Accelerated TS Referral Group 1 SouthB19150PUD SewerDesign Bid Build$388,556$427,412FY19Q4FY20Q1
78Milton Street Pavement ReplacementB19198PUD SewerSole Source$110,000$110,000FY19Q4FY20Q1
79CMP Storm Drain Lining IB20020Transportation and Storm Water Department - Storm Water DivisionJob Order Contract$385,308$100,000FY20Q1FY20Q1
80Coast Bl Sea Cave Emerg Stablz ProjectB20040Transportation and Storm Water Department - Street DivisionSole Source Emergency Project$3,500,000$4,016,323FY20Q1FY20Q1
81Canyonside Community Park ImprovementsS12004Development Services DepartmentDesign Bid Build$1,041,250$1,751,126FY19Q3FY20Q1
82Block 4Y UUP21003600Transportation and Storm Water Department - Street DivisionDesign Bid Build$13,497,898$18,222,162FY19Q4FY20Q2
83Block 4-J1 UUD (Mid City)B13152TSWJob Order Contract$378,430$605,000FY19Q4FY20Q2
84Otay 2nd Pipeline Phase 1B14092PUD WaterDesign Bid Build$10,770,054$14,590,262FY19Q4FY20Q2
85Alamo, Salvation, 68th Street Basins LIDB14120Transportation and Storm Water Department - Storm Water DivisionDesign Bid Build$2,532,334$3,540,000FY20Q1FY20Q2
86Block 4Y UUPB15087Transportation and Storm Water Department - Street DivisionDesign Bid Build$1,348,999$1,815,854FY19Q4FY20Q2
87Off FHWA System Bridge RehabilitationB15127Transportation Engineering & Operations DivisionDesign Bid Build$270,367$506,122FY19Q4FY20Q2
88On System Bridge RehabilitationB15128Transportation Engineering & Operations DivisionDesign Bid Build$1,776,764$2,469,330FY20Q1FY20Q2
89Citywide Street Lights Group 1601B16007TSWJob Order Contract$363,620$500,000FY20Q3FY20Q2
90Citywide Street Lights Group 1602B16008TSWJob Order Contract$363,620$500,000FY20Q1FY20Q2
91Sewer & AC Water Group 841(S)B16037PUD WaterDesign Bid Build$1,708,356$2,819,295FY20Q1FY20Q2
92Hughes St (58th St to Jodi St) SL UU101B17010TSWJob Order Contract$125,000$132,000FY20Q4FY20Q2
93Bernardo Hts Py @ Calle Pueblito TSB17018TSWJob Order Contract$325,000$495,905FY20Q1FY20Q2
94Downtown Mobility Cycleway ImprovementB17056Transportation and Storm Water Department - Street DivisionDesign Bid Build$2,345,679$8,436,978FY19Q4FY20Q2
9570th-Alvarado to Saranac-SidewalkB17065Transportation Engineering & Operations DivisionDesign Bid Build$304,425$647,825FY19Q3FY20Q2
96Plaza De Panama Pipeline Replacement (S)B17132PUD SewerDesign Bid Build$1,102,042$1,410,103FY19Q3FY20Q2
97Plaza De Panama Pipeline Replacement (W)B17139PUD WaterDesign Bid Build$2,046,649$2,598,048FY19Q3FY20Q2
98Casa de Balboa Fire Alarm SystemB17181Parks & Recreation DepartmentDesign Bid Build$1,100,000$1,588,000FY19Q3FY20Q2
99AC Water & Sewer Group 1044 (S)B17185PUD SewerDesign Bid Build$316,848$583,057FY20Q1FY20Q2
100AC Water & Sewer Group 1044 (W)B17186PUD WaterDesign Bid Build$2,311,652$3,903,694FY20Q1FY20Q2
101Sewer & AC Water Group 841(W)B18072PUD WaterDesign Bid Build$1,101,094$1,801,837FY20Q1FY20Q2
102Street Paving Group 1901B18134TSWDesign Bid Build$11,000,000$12,550,000FY20Q2FY20Q2
103Street Paving Group 1902B18135TSWDesign Bid Build$11,000,000$12,550,000FY20Q2FY20Q2
104Bonita Cove West Playground ImprovementsB18229Parks & Recreation DepartmentDesign Bid Build$2,331,480$4,200,000FY20Q1FY20Q2
105Bonita Cove West Comfort Station ImproveB18230Parks & Recreation DepartmentDesign Bid Build$1,000,000$1,500,000FY20Q1FY20Q2
106SP17 JOC North Task 2 - Pomerado/Poway Rd/ClairemontB19007.2TSWJob Order Contract$5,000,000$5,500,000FY20Q4FY20Q4
107SP17 JOC South Task 2 - Harbor Dr/PicadorB19008.2TSWJob Order Contract$5,000,000$5,500,000FY20Q4FY20Q4
108PS 1 and 2 Cooling Tower ReplacementB19050PUD SewerJob Order Contract$795,400$825,400FY19Q1FY20Q2
109LaJolla Rec Center Bball Crt ResurfacingB19114Parks & Recreation DepartmentMinor Contract$210,000$400,000FY19Q4FY20Q2
110Park Villa Drive Water & Sewer Main Replacement (S)B20021PUD SewerJob Order Contract$165,716$240,687FY20Q1FY20Q2
111Park Villa Drive Water & Sewer Main Replacement (W)B20022PUD WaterJob Order Contract$422,396$725,068FY20Q1FY20Q2
112Montezuma PPL/Mid City Pipeline Ph 2S11026PUD WaterDesign Bid Build$33,639,377$46,001,752FY19Q3FY20Q2
113Otay 1st/2nd PPL West of Highland AvenueS12016PUD WaterDesign Bid Build$20,178,902$29,440,500FY20Q1FY20Q2
114Police Range Refurbishment Phase IIS18005Police DepartmentDesign Bid Build$10,998,313$12,601,000FY19Q4FY20Q2
115PACIFIC BEACH PIPELINE SOUTH (S)B12117PUD SewerDesign Bid Build$2,805,910$4,033,822FY20Q2FY20Q3
11631st Street UUD (Market St - L St)B13143TSWJob Order Contract$68,602$80,000FY20Q2FY20Q3
11725th (SB) Street UUP (Coronado-SB to GroB15088TSWJob Order Contract$85,000$126,000FY20Q2FY20Q3
118ADACA Crown Point Missing Walkways GF 16B16095Development Services DepartmentDesign Bid Build$456,127$921,000FY20Q1FY20Q3
119Loma Palisades SL Series Circuit ConvB16118TSWJob Order Contract$824,800$1,297,000FY20Q2FY20Q3
120Sewer & AC Water Crown Point West (W)B16144PUD SewerDesign Bid Build$6,403,000$8,586,547FY19Q3FY20Q3
121Sewer & AC Water Crown Point West (S)B16145PUD SewerDesign Bid Build$10,436,000$13,438,691FY19Q3FY20Q3
122Coronado SB (27th-Madden) SL UU193B17008TSWJob Order Contract$54,000$60,000FY20Q2FY20Q3
123Market Street Water Pipe ReplacementB17052PUD WaterDesign Bid Build$1,062,132$1,459,702FY20Q1FY20Q3
124Market Street Sewer Pipe ReplacementB17054PUD SewerDesign Bid Build$326,134$470,552FY20Q1FY20Q3
125Pipeline Rehabilitation AR-1B17150PUD SewerDesign Bid Build$3,947,000$4,813,000FY20Q1FY20Q3
126PIPELINE REHABILITATION AV-1B18062PUD SewerDesign Bid Build$3,311,832$5,277,500FY20Q2FY20Q3
127AC Water Group 1059B18196PUD WaterDesign Bid Build$3,112,385$5,943,201FY20Q1FY20Q3
128Concrete Panel Replacement Group 1940B19002TSWDesign Bid Build$3,585,000$4,024,231FY19Q3FY20Q3
129National Avenue Complete StreetB19137Transportation Engineering & Operations DivisionMultiple Award Construction Contract$19,633$30,000FY20Q3FY20Q3
130Street Resurfacing Mission BayB19195TSWJob Order Contract$4,976,000$6,536,000FY20Q2FY20Q3
131Street Paving Group 1903B19211Public UtilitiesDesign Bid Build$5,000,000$12,550,000FY20Q2FY20Q3
132Dennery Ranch Neighborhood ParkS00636Planning DepartmentAgency/ Developer Managed Built - City Paid$5,070,000$15,100,000FY20Q1FY20Q3
133Otay Mesa Truck Route Phase 4S11060TSWDesign Bid Build$9,990,149$16,404,743FY20Q1FY20Q3
134PACIFIC BEACH PIPELINE SOUTH (w)S12015PUD WaterDesign Bid Build$31,380,171$39,360,750FY20Q2FY20Q3
135Torrey Highlands Neighborhood Park UpgraS16036Parks & Recreation DepartmentDesign Bid Build$660,000$1,027,938FY20Q2FY20Q3
136Market St-47th ST to Euclid Complete StS16061Transportation and Storm Water Department - Storm Water DivisionDesign Bid Build$5,505,836$9,115,588FY19Q4FY20Q3

Summary By Asset-Managing Departments

Asset-Managing DepartmentEstimated Construction Contract AwardEstimated Total Project Cost
Development Services Department$2,252,377$3,854,024
Library Department$1,003,000$1,810,166
Parks & Recreation Department$11,268,500$19,723,970
Planning Department$5,070,000$15,100,000
PUD Water$174,029,299$236,985,858
PUD Sewer$125,924,764$160,693,809
Police Department$10,998,313$12,601,000
Transportation and Storm Water Department - Street Division$31,471,176$48,029,318
TSW$72,291,406$90,989,537
Transportation and Storm Water Department - Storm Water Division$20,761,045$29,186,420
Transportation Engineering & Operations Division$2,371,189$3,653,277
Public Utilities$17,313,000$22,284,000
ADA Compliance & Accessibility$360,300$805,000
Street Division$1,408,829$1,901,918
FY 2020 Total$476,523,199$647,618,297

Archive of Anticipated CIP Projects