Data Date: October 1, 2024
This page contains all Capital Improvements Program (CIP) projects anticipated to be advertised and awarded for construction in the current fiscal year listed initially in the City's Adopted CIP budget. This page is updated throughout the year with the current cost estimates and new projects to list. It also identifies which projects were already awarded to a construction contractor. In addition, some projects from the original list may roll-over to the first quarter of next fiscal year and possibly beyond due to unforeseen conditions. See Construction Contract Types for more information about delivery methods. Also, visit Bid and Contract Opportunities for projects currently in the bid and award phase For more information about this report, call (619) 533-4207 or email engineering@sandiego.gov.
DOWNLOAD - Forecast of Projects to be Awarded in Fiscal Year 2025 (First Quarter Update)
A summary by asset-managing departments is listed at the bottom of this page.
* To sort on a column, click on its heading. To sort on multiple columns, hold the Shift key while clicking.
Line Number | Project Name | Project Number | Asset Managing Department | Contract Type | Estimated Contract Cost ($) | Estimated Total Project Cost ($) | Fiscal Year Advertising | Quarter Advertising | Fiscal Year Awarding | Quarter Awarding | |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | Pump Station 1 Improvement and Modernization | L24000.1 | Public Utilities | Design Bid Build | $93,282,580 | $111,369,543 | FY25 | Q2 | FY25 | Q2 | |
2 | Morena Pipeline | S16027 | Public Utilities | Design Bid Build | $72,462,403 | $121,951,722 | FY25 | Q1 | FY25 | Q2 | |
3 | El Camino Real to ViaDeLaValle (1/2mile) | S00856 | Transportation | Design Bid Build | $69,117,148 | $102,639,440 | FY25 | Q3 | FY25 | Q4 | |
4 | South Mission Beach SD Replacement | B18117 | Stormwater | Design Bid Build | $55,863,950 | $68,877,839 | FY24 | Q2 | FY25 | Q2 | |
5 | Alvarado Trunk Sewer Phase IV | S15019 | Public Utilities | Design Bid Build | $54,300,000 | $72,349,085 | FY25 | Q2 | FY25 | Q4 | |
6 | Mira Mesa Pool & Skate Plaza Ph2 | L16002.1 | Parks & Recreation | Design Bid Build | $43,308,127 | $55,524,058 | FY23 | Q4 | FY25 | Q1 | |
7 | Oak Park Library | S22011 | Library | Design Build | $33,073,904 | $37,285,000 | FY24 | Q2 | FY25 | Q2 | |
8 | Palm Avenue Interstate 805 Interchange | S00869 | Transportation | Agency/ Developer Managed Built - City Paid | $31,500,000 | $50,630,634 | FY25 | Q2 | FY25 | Q4 | |
9 | AC Water & Sewer Group 1049 (W) | B18089 | Public Utilities | Design Bid Build | $27,473,696 | $32,161,276 | FY24 | Q4 | FY25 | Q3 | |
10 | Fire Station 48 | S15015 | Fire-Rescue | Design Build | $25,850,000 | $32,000,000 | FY24 | Q4 | FY25 | Q3 | |
11 | Normal Heights Improv 1 (W) | B21049 | Public Utilities | Design Build | $23,670,211 | $27,689,811 | FY25 | Q1 | FY25 | Q3 | |
12 | SBWRP Reverse Osmosis System | B20122 | Public Utilities | Design Bid Build | $22,289,426 | $25,869,426 | FY25 | Q3 | FY25 | Q4 | |
13 | Rolando Improv 2 (S) | B21031 | Public Utilities | Design Build | $16,570,874 | $21,671,430 | FY24 | Q3 | FY25 | Q2 | |
14 | Corridor Improv 1 (W) | B20037 | Public Utilities | Design Build | $14,160,600 | $17,259,200 | FY25 | Q1 | FY25 | Q3 | |
15 | AC Overlay Group 2402 | B24012 | Transportation | Design Bid Build | $13,748,930 | $21,420,000 | FY25 | Q1 | FY25 | Q2 | |
16 | Paradise Hills Improv 2 (W) | B24044 | Public Utilities | Design Build | $13,513,770 | $19,559,000 | FY25 | Q1 | FY25 | Q3 | |
17 | Oak Park Improv 2 (W) | B22023 | Public Utilities | Design Build | $11,356,700 | $15,903,600 | FY24 | Q2 | FY25 | Q2 | |
18 | Alvarado TS Water Main Relocations | B18104 | Public Utilities | Design Bid Build | $9,403,562 | $10,903,273 | FY25 | Q2 | FY25 | Q4 | |
19 | STORM WATER DIVERSION AT THE PLWTP | B20001 | Public Utilities | Design Bid Build | $8,756,775 | $12,922,725 | FY25 | Q3 | FY25 | Q4 | |
20 | Pressure Reducing Stations Upgrades Phs1 | B16017 | Public Utilities | Design Bid Build | $8,600,000 | $11,470,575 | FY25 | Q2 | FY25 | Q4 | |
21 | Point Loma Heights Improv 3 (W) | B24048 | Public Utilities | Design Build | $8,487,000 | $13,142,000 | FY25 | Q2 | FY25 | Q4 | |
22 | Stockton Improv 1 (S) | B20028 | Public Utilities | Design Bid Build | $8,284,500 | $12,307,600 | FY25 | Q4 | FY25 | Q4 | |
23 | College West Improv 3 (S) | B20085 | Public Utilities | Design Bid Build | $8,048,000 | $11,509,000 | FY25 | Q2 | FY25 | Q4 | |
24 | South Mission Beach GI | B18118 | Stormwater | Design Bid Build | $7,813,062 | $10,973,869 | FY24 | Q2 | FY25 | Q2 | |
25 | AC Overlay Group 2401 | B24011 | Transportation | Design Bid Build | $7,770,695 | $10,404,106 | FY24 | Q4 | FY25 | Q2 | |
26 | Talmadge Improv 2 (W) | B23142 | Public Utilities | Design Build | $7,692,300 | $12,000,000 | FY25 | Q1 | FY25 | Q4 | |
27 | HIDDEN TRAILS NEIGHBORHOOD PARK | S00995 | Parks & Recreation | Design Bid Build | $7,638,107 | $11,313,703 | FY25 | Q2 | FY25 | Q4 | |
28 | San Carlos Interconnect Trans Pipeline | B21109 | Public Utilities | Design Bid Build | $7,500,000 | $9,120,900 | FY25 | Q2 | FY25 | Q4 | |
29 | Rolando Improv 2 (W) | B21033 | Public Utilities | Design Build | $7,343,621 | $12,624,402 | FY24 | Q3 | FY25 | Q2 | |
30 | Roseville/Fleet Ridge Improv 1 (W) | B22092 | Public Utilities | Design Build | $6,669,520 | $8,040,520 | FY25 | Q1 | FY25 | Q3 | |
31 | AC Overlay Group 2403 | B24013 | Transportation | Job Order Contract | $6,262,037 | $8,250,000 | FY24 | Q4 | FY25 | Q1 | |
32 | College East Improv 1 (S) | B21028 | Public Utilities | Design Build | $6,260,580 | $10,251,000 | FY24 | Q3 | FY25 | Q3 | |
33 | AC Overlay Group 2304 | B23157 | Transportation | Design Bid Build | $6,023,038 | $8,533,323 | FY24 | Q4 | FY25 | Q2 | |
34 | Valencia Park Improv 2 (S) | B20132 | Public Utilities | Design Bid Build | $5,732,190 | $9,187,500 | FY25 | Q2 | FY25 | Q4 | |
35 | Morena Improv 2 (w) | B20128 | Public Utilities | Design Bid Build | $5,672,400 | $8,533,100 | FY25 | Q2 | FY25 | Q4 | |
36 | Clay Neighborhood Park Improvements | B22047 | Parks & Recreation | Design Bid Build | $5,657,553 | $7,850,553 | FY25 | Q3 | FY25 | Q4 | |
37 | Encanto Improv 3 (S) | B22007 | Public Utilities | Design Bid Build | $5,568,000 | $8,045,800 | FY25 | Q2 | FY25 | Q4 | |
38 | S. De Anza Basketball Courts and Play Ar | B19173 | Parks & Recreation | Design Bid Build | $5,416,000 | $7,193,000 | FY25 | Q2 | FY25 | Q4 | |
39 | Sewer & AC Water Group 1037 (S) | B18111 | Public Utilities | Design Build | $5,009,300 | $7,163,400 | FY25 | Q1 | FY25 | Q3 | |
40 | Stockton Improv 2 (W) | B20047 | Public Utilities | Design Bid Build | $4,893,300 | $7,266,600 | FY25 | Q3 | FY25 | Q4 | |
41 | Stockton Improv 2 (S) | B20048 | Public Utilities | Design Bid Build | $4,762,500 | $7,072,400 | FY25 | Q3 | FY25 | Q4 | |
42 | AC Overlay Group 2405 | B24149 | Transportation | Job Order Contract | $4,704,022 | $6,371,022 | FY25 | Q1 | FY25 | Q1 | |
43 | 8097 Hemingway Ave SD Emergency | B24131 | Stormwater | Emergency (As-needed) | $4,600,000 | $4,850,000 | FY24 | Q3 | FY25 | Q1 | |
44 | Roseville/Fleet Ridge Improv 1 (S) | B22097 | Public Utilities | Design Build | $4,563,125 | $5,924,125 | FY25 | Q1 | FY25 | Q3 | |
45 | Asphalt Overlay Group 2501 | B25001 | Transportation | Job Order Contract | $4,500,000 | $5,168,000 | FY25 | Q2 | FY25 | Q3 | |
46 | AC Overlay 2202 Phase 2 (SS) | B24014 | Transportation | Job Order Contract | $4,458,616 | $5,548,463 | FY24 | Q3 | FY25 | Q1 | |
47 | Miramar WTP Interim Solids Management | B23049 | Public Utilities | Design Bid Build | $4,409,785 | $5,612,453 | FY25 | Q1 | FY25 | Q3 | |
48 | Azalea Park Improv 2 (W) | B22019 | Public Utilities | Design Bid Build | $4,284,900 | $6,940,000 | FY25 | Q2 | FY25 | Q4 | |
49 | AC Water & Sewer Group 1049 (S) | B18097 | Public Utilities | Design Bid Build | $4,278,661 | $6,018,032 | FY24 | Q4 | FY25 | Q3 | |
50 | Pump Station 2 Emergency Repair | B24150 | Public Utilities | Emergency (As-needed) | $4,200,000 | $4,800,000 | FY24 | Q4 | FY25 | Q1 | |
51 | East Village Improv 1 (S) | B20134 | Public Utilities | Design Build | $4,099,100 | $5,836,300 | FY25 | Q2 | FY25 | Q4 | |
52 | Southcrest Green Infrastructure (GI) | B16112 | Stormwater | Design Bid Build | $4,089,417 | $5,698,405 | FY24 | Q4 | FY25 | Q1 | |
53 | La Jolla Improv 3 (W) | B20023 | Public Utilities | Design Bid Build | $4,000,000 | $5,052,647 | FY25 | Q3 | FY25 | Q4 | |
54 | 5th and Brookes SD Upgrade | B19073 | Stormwater | Design Bid Build | $3,873,923 | $6,015,938 | FY25 | Q1 | FY25 | Q3 | |
55 | San Ysidro Act Cntr Prking Lot & ADA Imp | B20097 | Parks & Recreation | Design Bid Build | $3,850,666 | $5,800,000 | FY24 | Q2 | FY25 | Q1 | |
56 | Sewer & AC Water Group 1058 (S) | B18191 | Public Utilities | Design Bid Build | $3,839,400 | $5,887,767 | FY25 | Q2 | FY25 | Q4 | |
57 | Corridor Improv 1 (S) | B20036 | Public Utilities | Design Build | $3,699,500 | $4,892,800 | FY25 | Q1 | FY25 | Q3 | |
58 | AC Overlay Group 2502 | B25002 | Transportation | Job Order Contract | $3,600,000 | $4,831,000 | FY25 | Q1 | FY25 | Q2 | |
59 | Valencia Park Improv 3 (s) | B21075 | Public Utilities | Design Bid Build | $3,540,000 | $4,438,000 | FY25 | Q3 | FY25 | Q4 | |
60 | Jamacha Lomita Storm Drain | B16094 | Stormwater | Design Bid Build | $3,462,882 | $5,674,303 | FY25 | Q2 | FY25 | Q4 | |
61 | Normal Heights Improv 1 (S) | B21048 | Public Utilities | Design Build | $3,300,799 | $4,149,799 | FY25 | Q1 | FY25 | Q3 | |
62 | AC Overlay Group 2303 | B23156 | Transportation | Design Bid Build | $3,273,925 | $4,828,600 | FY24 | Q4 | FY25 | Q2 | |
63 | Linda Vista Improv 1 (S) | B24053 | Public Utilities | Job Order Contract | $3,266,000 | $4,527,000 | FY25 | Q3 | FY25 | Q4 | |
64 | S. De Anza Parking Lot | B19162 | Parks & Recreation | Design Bid Build | $3,200,000 | $4,390,000 | FY25 | Q2 | FY25 | Q4 | |
65 | 6760 High Country Court SD Emergency | B24144 | Stormwater | Sole Source Emergency | $3,000,000 | $4,000,000 | FY25 | Q2 | FY25 | Q2 | |
66 | SV Dam Low Level Outlet Improvements | B22002 | Public Utilities | Design Bid Build | $3,000,000 | $5,366,555 | FY25 | Q2 | FY25 | Q4 | |
67 | AC Overlay Group 2404 | B24148 | Transportation | Job Order Contract | $2,834,497 | $4,507,442 | FY25 | Q1 | FY25 | Q2 | |
68 | College East Improv 1 (W) | B21029 | Public Utilities | Design Build | $2,817,990 | $4,662,100 | FY24 | Q4 | FY25 | Q3 | |
69 | Solana Highlands NP-Comfort Station | S16032 | Parks & Recreation | Design Bid Build | $2,754,900 | $4,331,000 | FY25 | Q2 | FY25 | Q4 | |
70 | Asphalt Overlay Group 2504 | B25004 | Transportation | Job Order Contract | $2,743,730 | $3,778,589 | FY25 | Q2 | FY25 | Q2 | |
71 | Genesee Ave-Chateau to Sauk Sidewalk | B15168 | Transportation | Design Bid Build | $2,730,910 | $4,899,015 | FY25 | Q1 | FY25 | Q3 | |
72 | AC Overlay Group 2406 | B24147 | Transportation | Job Order Contract | $2,700,000 | $3,100,000 | FY25 | Q2 | FY25 | Q2 | |
73 | North Park Improv 4 (S) | B24033 | Public Utilities | Design Bid Build | $2,698,000 | $4,110,000 | FY25 | Q2 | FY25 | Q4 | |
74 | Old Logan Heights Library Renovation | S22010 | Library | Design Bid Build | $2,687,000 | $5,846,237 | FY25 | Q1 | FY25 | Q3 | |
75 | AC Water & Sewer Group 1029 (P) | B22062 | Transportation | Job Order Contract | $2,470,000 | $2,470,000 | FY23 | Q2 | FY25 | Q2 | |
76 | Asphalt Overlay Group 2503 | B25003 | Transportation | Job Order Contract | $2,405,000 | $4,116,000 | FY25 | Q1 | FY25 | Q2 | |
77 | Block 7G2 Rd Imp (CS) UU209 | B24086 | Transportation | Job Order Contract | $2,350,000 | $3,348,000 | FY25 | Q2 | FY25 | Q2 | |
78 | El Camino Real Pipeline North | L23001.1 | Public Utilities | Design Bid Build | $2,343,850 | $3,510,588 | FY25 | Q3 | FY25 | Q4 | |
79 | Citywide Referral Rehab 1 (S) | B24043 | Public Utilities | Design Bid Build | $2,205,000 | $3,394,000 | FY25 | Q2 | FY25 | Q4 | |
80 | NTC H-Barracks Shelter Project | L24002.1 | Economic Development | Job Order Contract | $2,190,000 | $2,978,648 | FY25 | Q2 | FY25 | Q2 | |
81 | Torrey Pines Improv 1 (S) | B21045 | Public Utilities | Design Bid Build | $2,131,092 | $3,102,647 | FY24 | Q3 | FY25 | Q2 | |
82 | District 1 Block 1-J UUD | B00836 | Transportation | Job Order Contract | $2,075,809 | $2,688,627 | FY25 | Q1 | FY25 | Q2 | |
83 | 6137 Tarragona Drive SD Emergency | B24142 | Stormwater | Emergency (As-needed) | $2,000,000 | $3,000,000 | FY24 | Q4 | FY25 | Q1 | |
84 | NCWRP - Chiller Replacement | B20148 | Public Utilities | Design Bid Build | $2,000,000 | $3,705,121 | FY25 | Q2 | FY25 | Q4 | |
85 | Miramar Landfill Office Trailer Replacement | L17000.7 | Environmental Services | Design Build | $2,000,000 | $2,500,000 | FY25 | Q2 | FY25 | Q2 | |
86 | AC Water & Sewer Group 1054A (W) | B19119 | Public Utilities | Design Bid Build | $1,979,800 | $2,903,700 | FY25 | Q2 | FY25 | Q4 | |
87 | Morena Improv 2 (s) | B20133 | Public Utilities | Design Bid Build | $1,893,100 | $2,984,100 | FY25 | Q2 | FY25 | Q4 | |
88 | Block 7G2 Rd Improv UU209 UU629 (P) | B24087 | Transportation | Job Order Contract | $1,880,000 | $1,880,000 | FY25 | Q2 | FY25 | Q2 | |
89 | Accelerated Sewer Referral Group 847 | B18183 | Public Utilities | Design Bid Build | $1,867,000 | $4,035,067 | FY25 | Q2 | FY25 | Q3 | |
90 | Crown Point Playground Improvements | B19021 | Parks & Recreation | Job Order Contract | $1,720,200 | $3,108,500 | FY24 | Q3 | FY25 | Q2 | |
91 | Ocean Beach Improv 1 (S) | B22004 | Public Utilities | Design Bid Build | $1,655,676 | $2,261,596 | FY25 | Q2 | FY25 | Q4 | |
92 | Sidewalk Replacement Group 2331 - CMR, R | B23092 | Transportation | Design Bid Build | $1,599,996 | $3,268,906 | FY24 | Q4 | FY25 | Q1 | |
93 | Accelerated Sewer Referral Group 852 | B19064 | Public Utilities | Design Bid Build | $1,573,000 | $2,609,600 | FY25 | Q2 | FY25 | Q4 | |
94 | 11131 Negley Avenue SD Emergency | B24146 | Stormwater | Sole Source Emergency | $1,500,000 | $2,000,000 | FY24 | Q4 | FY25 | Q1 | |
95 | 7403 Rowena Street SD Emergency | B24145 | Stormwater | Sole Source Emergency | $1,500,000 | $2,000,000 | FY24 | Q4 | FY25 | Q2 | |
96 | Pump Station B SD Rehab Emergency | B25024 | Stormwater | Sole Source Emergency | $1,500,000 | $2,000,000 | FY25 | Q1 | FY25 | Q1 | |
97 | Pacific Highway 8-in Swr Repl Emergency | B25026 | Public Utilities | Sole Source Emergency | $1,500,000 | $1,800,000 | FY25 | Q1 | FY25 | Q1 | |
98 | Sewer & AC Water Group 1037 (W) | B18114 | Public Utilities | Design Build | $1,493,800 | $2,367,822 | FY25 | Q1 | FY25 | Q3 | |
99 | Demolition of Loma Land Structures | L14005.1 | Parks & Recreation | Design Bid Build | $1,462,500 | $3,146,990 | FY25 | Q3 | FY25 | Q4 | |
100 | Signal Mods in Barrio Logan | B13010 | Transportation | Job Order Contract | $1,430,000 | $2,151,900 | FY25 | Q2 | FY25 | Q4 | |
101 | Serra Mesa Improv 1 Rehab (S) | B23112 | Public Utilities | Design Bid Build | $1,429,200 | $2,198,000 | FY25 | Q1 | FY25 | Q3 | |
102 | Crown Point Parking Lot Improvements | B19022 | Parks & Recreation | Job Order Contract | $1,389,000 | $2,372,000 | FY24 | Q3 | FY25 | Q2 | |
103 | MBC Gallery Pipeline Replacement | B21148 | Public Utilities | Design Bid Build | $1,323,000 | $2,075,000 | FY25 | Q2 | FY25 | Q3 | |
104 | S. De Anza Comfort Station | B19172 | Parks & Recreation | Design Bid Build | $1,300,000 | $2,657,000 | FY25 | Q2 | FY25 | Q4 | |
105 | Chicano Park Improvements Phase III | B20060 | Parks & Recreation | Job Order Contract | $1,202,065 | $2,024,321 | FY25 | Q2 | FY25 | Q4 | |
106 | Camino Del Rio West & Moore St Median | B19049 | Transportation | Design Bid Build | $1,189,000 | $1,932,385 | FY25 | Q2 | FY25 | Q4 | |
107 | Hilltop PH I(Boundary-Toyne)Rd Imp UU617 | B18153 | Transportation | Design Bid Build | $1,161,665 | $671,712 | FY24 | Q2 | FY25 | Q1 | |
108 | Block 8R UUP - CIP | B15097 | Transportation | Design Bid Build | $1,114,000 | $1,464,000 | FY25 | Q2 | FY25 | Q4 | |
109 | Otay WTP Raw Water PS Switchboard Replac | B22037 | Public Utilities | Design Bid Build | $1,100,000 | $1,990,000 | FY25 | Q2 | FY25 | Q4 | |
110 | Block 1M (La Jolla 4) Rd Imp UU659_RP | B18155 | Transportation | Job Order Contract | $1,084,176 | $1,857,978 | FY25 | Q1 | FY25 | Q2 | |
111 | Sewer & AC Water Group 1058 (W) | B18193 | Public Utilities | Design Bid Build | $1,079,100 | $2,171,398 | FY25 | Q2 | FY25 | Q4 | |
112 | Block 2BB (Pacific Beach) SL UU854 | B18023 | Transportation | Job Order Contract | $1,078,000 | $1,673,757 | FY25 | Q1 | FY25 | Q2 | |
113 | AC Water & Sewer Group 1054A (S) | B19121 | Public Utilities | Design Bid Build | $1,075,000 | $1,576,600 | FY25 | Q2 | FY25 | Q4 | |
114 | Morena Improv 3 (S) | B21064 | Public Utilities | Design Bid Build | $1,061,220 | $1,421,911 | FY23 | Q4 | FY25 | Q3 | |
115 | Storm Drain Group 763 | B17143 | Stormwater | Design Bid Build | $1,056,000 | $1,904,266 | FY25 | Q2 | FY25 | Q4 | |
116 | PQPS VFD Replacement Project | B22032 | Public Utilities | Design Bid Build | $1,051,560 | $1,704,736 | FY25 | Q1 | FY25 | Q3 | |
117 | Traffic Signal Mods Grp 20-01 | B20075 | Transportation | Design Bid Build | $1,025,180 | $1,840,000 | FY25 | Q1 | FY25 | Q4 | |
118 | East Village Improv 1 (W) | B20125 | Public Utilities | Design Build | $1,004,500 | $1,704,529 | FY25 | Q2 | FY25 | Q4 | |
119 | Stockton Improv 1 (W) | B20030 | Public Utilities | Design Bid Build | $897,030 | $1,553,900 | FY25 | Q4 | FY25 | Q4 | |
120 | Kettner & Palm Pedestrian Hybrid Beacon | B18046 | Transportation | Design Bid Build | $890,000 | $1,580,810 | FY25 | Q2 | FY25 | Q3 | |
121 | Terminal Parking Lot East Rehabilitation | B22157 | Airports | Job Order Contract | $885,967 | $1,558,347 | FY25 | Q2 | FY25 | Q2 | |
122 | Miramar Pl Fleet Main Facility Upgrade | B23031 | Environmental Services | Job Order Contract | $853,260 | $1,333,242 | FY25 | Q3 | FY25 | Q4 | |
123 | Saturn Blvd Sidewalk Installation | B24109 | Transportation | Quick Build | $850,000 | $1,500,000 | FY25 | Q3 | FY25 | Q4 | |
124 | AC Overlay Group 2519 UUP | B25019 | Transportation | Job Order Contract | $813,746 | $813,746 | FY25 | Q1 | FY25 | Q2 | |
125 | Mission Bl(Loring-Turquoise) Rd Imp UU30 | B18140 | Transportation | Job Order Contract | $809,552 | $1,419,552 | FY25 | Q2 | FY25 | Q3 | |
126 | El Cajon & Kansas - Traffic Signal | B19060 | Transportation | Design Bid Build | $787,100 | $1,580,000 | FY25 | Q1 | FY25 | Q3 | |
127 | Cass (Grand-Pacific Bch Dr) Rd Imp UU143 | B18148 | Transportation | Job Order Contract | $782,742 | $1,528,991 | FY25 | Q2 | FY25 | Q3 | |
128 | San Vicente PH I-II Rd Imp UU505-UU506 | B17098 | Transportation | Design Bid Build | $729,455 | $1,146,550 | FY24 | Q2 | FY25 | Q1 | |
129 | Mission Blvd South Loring Overlay | B24135 | Transportation | Job Order Contract | $654,293 | $1,034,293 | FY25 | Q2 | FY25 | Q3 | |
130 | Block 6DD1 (Clairemont Mesa)Rd Imp UU410 | B18142 | Transportation | Design Bid Build | $652,000 | $1,186,549 | FY25 | Q2 | FY25 | Q4 | |
131 | Miramar WTP Caustic Pumping System | B23014 | Public Utilities | Design Bid Build | $600,000 | $1,678,250 | FY25 | Q1 | FY25 | Q3 | |
132 | Chatsworth Blvd RRFB & Ped Refuge Island | B21117 | Transportation | Design Bid Build | $514,900 | $979,035 | FY24 | Q3 | FY25 | Q2 | |
133 | Valencia Park Improv 4 (S) | B21096 | Public Utilities | Design Bid Build | $470,300 | $736,800 | FY25 | Q1 | FY25 | Q4 | |
134 | Fanuel St III (Grand-PB Dr) Rd Imp UU188 | B17071 | Transportation | Design Bid Build | $465,000 | $845,890 | FY25 | Q2 | FY25 | Q4 | |
135 | Mountain View Improv 1 (S) | B20149 | Public Utilities | Design Bid Build | $453,800 | $715,799 | FY25 | Q1 | FY25 | Q2 | |
136 | 8690 Aero Drive Roof Replacement | B22146 | Airports | Quick Build | $450,000 | $593,000 | FY25 | Q1 | FY25 | Q3 | |
137 | 32nd St PHII (Market-Imp.) Rd Imp UU17 | B18141 | Transportation | Design Bid Build | $434,665 | $685,115 | FY24 | Q2 | FY25 | Q1 | |
138 | Morena Improv 3A (W) | B22152 | Public Utilities | Design Bid Build | $406,875 | $596,574 | FY23 | Q4 | FY25 | Q3 | |
139 | Wightman (Chamoune -Euclid) Rd Imp UU388 | B18138 | Transportation | Design Bid Build | $396,548 | $640,096 | FY25 | Q2 | FY25 | Q4 | |
140 | Traffic Signal Mods Grp 19-02 | B19071 | Transportation | Design Build | $380,350 | $850,000 | FY25 | Q2 | FY25 | Q4 | |
141 | 31st Street (Market-L St) Rd Imp UU11 | B18147 | Transportation | Design Bid Build | $379,250 | $655,846 | FY25 | Q2 | FY25 | Q4 | |
142 | Morena Pipeline (BL) | B22107 | Transportation | Design Bid Build | $373,688 | $373,688 | FY23 | Q4 | FY25 | Q4 | |
143 | Hughes St (58th St-Jodi St) Rd Imp UU101 | B18151 | Transportation | Job Order Contract | $351,690 | $870,510 | FY25 | Q1 | FY25 | Q2 | |
144 | Black Mountain Reservoir Spillway Stairs | B23110 | Public Utilities | Design Bid Build | $350,000 | $700,000 | FY25 | Q2 | FY25 | Q4 | |
145 | Howard PHI-II(Park-Texas) Rd Imp UU71-72 | B18136 | Transportation | Design Bid Build | $317,553 | $702,606 | FY25 | Q2 | FY25 | Q4 | |
146 | Scripps Miramar Ranch Lib Fire Sys Repl | B23160 | General Services | Job Order Contract | $301,412 | $401,412 | FY24 | Q2 | FY25 | Q1 | |
147 | El Cuervo Adobe Improvements | S14006 | Parks & Recreation | Design Bid Build | $292,315 | $508,783 | FY25 | Q3 | FY25 | Q4 | |
148 | Coronado SB (27th SB-Madden)Rd Imp UU193 | B18137 | Transportation | Design Bid Build | $271,500 | $512,254 | FY25 | Q2 | FY25 | Q4 | |
149 | Morena Bl & W. Bernardo Medians | B15015 | Transportation | Multiple | $245,000 | $506,561 | FY24 | Q2 | FY25 | Q3 | |
150 | 32nd St PH I (Market-F St) Rd Imp UU386 | B18144 | Transportation | Design Bid Build | $163,750 | $310,346 | FY25 | Q2 | FY25 | Q4 | |
151 | PQPS Gas Sensor Replacement | B22035 | Public Utilities | Design Bid Build | $109,519 | $629,679 | FY25 | Q1 | FY25 | Q3 | |
152 | 25th (SB) (Coronado-Grove) Rd Imp UU995 | B18150 | Transportation | Design Bid Build | $85,000 | $207,463 | FY25 | Q2 | FY25 | Q4 | |
153 | South Mission Beach SD Replacement (BL) | B23088 | Transportation | Design Bid Build | $70,820 | $93,426 | FY24 | Q2 | FY25 | Q2 | |
154 | AC Overlay Group 2505 | B25005 | Transportation | Design Bid Build | $- | $300,000 | FY25 | Q2 | FY25 | Q3 | |
155 | AC Overlay Group 2506 | B25006 | Transportation | Design Bid Build | $- | $300,000 | FY25 | Q2 | FY25 | Q3 | |
156 | AC Overlay Group 2507 | B25007 | Transportation | Design Bid Build | $- | $300,000 | FY25 | Q2 | FY25 | Q3 |
Summary By Asset-Managing Departments
Asset-Managing Department | Estimated Construction Contract Award | Estimated Total Project Cost |
---|---|---|
Library | $35,760,904 | $43,131,237 |
Parks & Recreation | $79,191,433 | $110,219,908 |
Public Utilities | $556,814,489 | $769,689,883 |
Fire-Rescue | $25,850,000 | $32,000,000 |
Environmental Services | $2,853,260 | $3,833,242 |
Stormwater | $90,259,233 | $116,994,620 |
Transportation | $198,248,977 | $295,196,225 |
General Services | $301,412 | $401,412 |
Airports | $1,335,967 | $2,151,347 |
Economic Development | $2,190,000 | $2,978,648 |
FY 2024 Total | $992,805,675 | $1,376,596,521 |
Archive of Anticipated CIP Projects
Forecast of Projects to be Awarded in Fiscal Year 2024
- Forecast of Projects to be Awarded in Fiscal Year 2024 (Third Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2024 (Mid-Year Update)
- Forecast of Projects to be Awarded in Fiscal Year 2024 (First Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2024 (Adopted Budget)
- Forecast of Projects to be Awarded in Fiscal Year 2024 (Proposed Budget)
Forecast of Projects to be Awarded in Fiscal Year 2023
- Forecast of Projects to be Awarded in Fiscal Year 2023 (Third Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2023 (Mid-Year Update)
- Forecast of Projects to be Awarded in Fiscal Year 2023 (First Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2023 (Adopted Budget)
- Forecast of Projects to be Awarded in Fiscal Year 2023 (Proposed Budget)
Forecast of Projects to be Awarded in Fiscal Year 2022
- Forecast of Projects to be Awarded in Fiscal Year 2022 (Third Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2022 (Mid-Year Update)
- Forecast of Projects to be Awarded in Fiscal Year 2022 (First Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2022 (Adopted Budget)
- Forecast of Projects to be Awarded in Fiscal Year 2022 (Proposed Budget)
Forecast of Projects to be Awarded in Fiscal Year 2021
- Forecast of Projects to be Awarded in Fiscal Year 2021 (Third Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2021 (Mid-Year Update)
- Forecast of Projects to be Awarded in Fiscal Year 2021 (First Quarter Update)
- Forecast of Projects to be Awarded in Fiscal Year 2021 (Adopted Budget)
- Forecast of Projects to be Awarded in Fiscal Year 2021 (Proposed Budget)
Forecast of Projects to be Awarded in Fiscal Year 2016
- Forecast of Projects to be Awarded in Fiscal Year 2016 (Third Quarter Update) as of 4/1/2016
- Forecast of Projects to be Awarded in Fiscal Year 2016 (Second Quarter Update) as of 1/1/2016