Data Date: February 1, 2020

To create the print version set the font-size:0.5em on both tables. Save as PDF in Chrome; More Settings - Margins:None and Scale:85. Also change link on https://www.sandiego.gov/cip/reports to match the year if starting with quarter 1.

This page contains all Capital Improvements Program (CIP) projects anticipated to be advertised and awarded for construction in the current fiscal year listed initially in the City'sAdopted CIP budget. This page is updated throughout the year with the current cost estimates and new projects to list. It also identifies which projects werealready awardedto a construction contractor. In addition, some projects from the original list may roll-over to the first quarter of next fiscal year and possibly beyond due to unforeseen conditions. SeeConstruction Contract Typesfor more information about delivery methods. Also, visitBid and Contract Opportunitiesfor projects currently in the bid and award phase For more information about this report, call (619) 533-4207 or emailengineering@sandiego.gov.

PDF icon PRINT - Forecast of Projects to be Awarded Fiscal Year 2021 (Proposed Budget)

File DOWNLOAD - Forecast of Projects to be Awarded in Fiscal Year 2021 (Proposed Budget)

Asummary by asset-managing departmentsis listed at the bottom of this page.

*To sort on a column, click on its heading. To sort on multiple columns, hold the Shift key while clicking.

Line
Number
Project
Name
Project
Number
Asset Managing
Department
Contract
Type
Estimated
Contract
Cost ($)
Estimated
Total Project
Cost ($)
Fiscal Year
Advertising
Quarter
Advertising
Fiscal Year
Awarding
Quarter
Awarding
1Pomerado Park Reservoir UpgradeB00156PUD WaterDesign Bid Build$4,875,000$6,888,000FY21Q1FY21Q3
2Sewer & AC Water Group 763 (S)B00374PUD WaterDesign Bid Build$4,080,280$5,720,817FY20Q4FY21Q2
3Sewer and AC Water Group 793 (S)B00394PUD SewerDesign Bid Build$5,305,291$6,624,611FY21Q2FY21Q3
4Sewer and AC Water Group 812 (S)B00426PUD WaterDesign Bid Build$3,047,000$4,030,000FY21Q1FY21Q3
5MISSION CTR CNYN A SMRB00431PUD SewerDesign Bid Build$2,164,500$3,188,600FY20Q4FY21Q2
6SEWER GROUP 828B00434PUD SewerDesign Bid Build$4,807,950$6,744,100FY21Q2FY21Q4
7Stlight Design & Install 30th St - OceanB12001TSWJob Order Contract$107,100$126,000FY20Q4FY21Q1
8Water & Sewer Group 965 (S)B12048PUD SewerDesign Bid Build$1,855,400$2,932,600FY21Q2FY21Q4
9Water & Sewer Group 965 (W)B12057PUD WaterDesign Bid Build$1,769,500$2,934,600FY21Q2FY21Q4
10Signal Mods in Barrio LoganB13010TSWDesign Bid Build$190,900$300,000FY20Q3FY21Q1
11Adams Ave (1620) Storm Drain ReplacementB13102Transportation and Storm Water Department - Storm Water DivisionDesign Bid Build$500,000$868,000FY21Q1FY21Q3
12Division St & Osborn St Traffic SignalB15047TSWDesign Bid Build$212,200$275,000FY21Q3FY21Q4
13Pacific Beach TS Interconnect UpgradeB15065Transportation and Storm Water Department - Street DivisionJob Order Contract$933,030$1,841,619FY20Q3FY21Q1
14Sewer and AC Water Group 793 (W)B15070PUD WaterDesign Bid Build$677,900$964,700FY21Q2FY21Q3
15Block 1M1 UUP (La Jolla)B15084TSWJob Order Contract$252,450$297,000FY20Q4FY21Q1
16Hancock Street UUP (Witherby to TourquoiB15096TSWJob Order Contract$53,550$63,000FY20Q4FY21Q1
17Block 2S2 UUPB15098TSWJob Order Contract$260,100$306,000FY20Q4FY21Q1
18North City Pure Water FacilityB15139Public UtilitiesDesign Bid Build$388,927,000$493,083,000FY21Q1FY21Q3
19North City Pure Water Pump StationB15140PUD WaterDesign Bid Build$12,709,200$19,997,559FY21Q1FY21Q3
20NC Morena Blvd Pump Stations & PipelinesB15141PUD WaterDesign Bid Build$90,000,000$100,000,000FY21Q1FY21Q3
21Morena Conveyance Northern Segment - B3B15141PUD WaterDesign Bid Build$98,047,703$122,559,629FY21Q1FY21Q3
22NCWRP Expansion (Pkg. 2)B15142Public UtilitiesDesign Bid Build$148,300,000$192,790,000FY21Q2FY21Q4
23Tecolote Cyn GC Water ConnB15203PUD WaterDesign Bid Build$229,000$278,000FY21Q2FY21Q4
24Pressure Reducing Stations Upgrades Phs1B16017PUD WaterDesign Bid Build$3,740,000$6,290,000FY21Q2FY21Q3
25North City Pure Water PipelineB16035PUD WaterDesign Bid Build$80,421,961$121,995,876FY21Q2FY21Q4
26ADA S/W Group 3E W Point LomaB16100Development Services DepartmentDesign Bid Build$538,000$1,139,502FY20Q4FY21Q2
27Southcrest Green Infrastructure (GI)B16112Transportation and Storm Water Department - Storm Water DivisionDesign Bid Build$3,007,000$4,500,000FY21Q1FY21Q3
28NCPWF Influent Pump Station and PipelineB16140Public UtilitiesDesign Bid Build$27,400,000$39,000,000FY21Q2FY21Q4
29Storm Drain Group 828B16155Transportation and Storm Water Department - Storm Water DivisionDesign Bid Build$1,840,150$3,000,000FY21Q2FY21Q4
30Otay 2nd Pipeline Phase 3B16158PUD WaterDesign Bid Build$10,116,000$12,636,000FY21Q1FY21Q3
31El Cajon Bl-Highland-58th ImprovB17003Transportation and Storm Water Department - Storm Water DivisionDesign Bid Build$643,000$1,215,050FY20Q4FY21Q2
32Murphy Canyon Trunk Sewer Repair/RehabB17005PUD SewerDesign Bid Build$12,378,317$16,393,110FY21Q2FY21Q3
33San Diego NC-MBC ImprovementsB17006Public UtilitiesDesign Bid Build$2,410,800$3,262,000FY21Q2FY21Q4
34Mt Acadia (Mt Alifan-Mt Burnham)SL UU621B17012TSWJob Order Contract$205,200$228,000FY21Q1FY21Q1
35Seminole PH2 (El Cajon-Stanley) SL UU630B17013TSWJob Order Contract$108,000$120,000FY21Q1FY21Q1
36Citywide Street Lights Group 1701B17050TSWDesign Bid Build$419,500$700,600FY20Q4FY21Q3
37Citywide Street Lights Group 1702B17051TSWDesign Bid Build$441,200$731,500FY20Q4FY21Q3
38Clairemont Mesa Sewer Pipe ReplacementB17087PUD SewerDesign Bid Build$153,800$228,400FY21Q1FY21Q2
39Curb Ramp Improvement Group 1701B17114Transportation and Storm Water Department - Street DivisionDesign Bid Build$3,138,800$4,137,600FY20Q4FY21Q1
40Sewer and AC Water Group 812 (W)B17115PUD WaterDesign Bid Build$1,916,000$2,555,000FY21Q1FY21Q3
41Sewer and AC Water Group 763 (W)B17116PUD WaterDesign Bid Build$1,350,000$1,686,013FY20Q4FY21Q2
42Mid-City & Eastern Area Signal ModsB17128TSWDesign Bid Build$389,086$629,860FY21Q3FY21Q4
43Balboa Park Pipeline Repl Ph II (S)B17133PUD SewerDesign Bid Build$1,852,000$3,043,651FY21Q2FY21Q4
44Balboa Park Pipeline Repl Ph II (W)B17140PUD WaterDesign Bid Build$3,790,000$6,319,547FY21Q2FY21Q4
45Torrey Pines Gf-Repr Storm Drain OutfallB17152Transportation and Storm Water Department - Storm Water DivisionDesign Bid Build$2,135,000$3,360,000FY21Q1FY21Q2
46Palm Ave Storm DrainB17163Transportation and Storm Water Department - Storm Water DivisionJob Order Contract$288,700$502,700FY20Q4FY21Q1
47Street Reconstruction Group 1801B17188Street DivisionDesign Bid Build$8,200,000$12,710,000FY21Q2FY21Q4
48Sewer Group 843B17189PUD SewerDesign Bid Build$4,224,400$5,719,300FY21Q1FY21Q2
49John F Kennedy Neighborhood Park ImproveB18005Parks & Recreation DepartmentDesign Bid Build$1,859,668$3,079,619FY20Q3FY21Q1
50Intelligent Cities Outdoor Lightng Proj2B18036Sustainability DepartmentDesign Bid Build$9,000,000$30,000,000FY20Q2FY21Q1
51Sewer & AC Water Group 1034 (S)B18063PUD SewerDesign Bid Build$4,968,400$6,806,400FY21Q2FY21Q3
52Sewer & AC Water Group 1034 (W)B18064PUD WaterDesign Bid Build$6,959,100$9,201,600FY21Q2FY21Q4
53Convert Bldg 619 @ NTC into Rec CenterB18087Parks & Recreation DepartmentDesign Bid Build$3,579,000$6,228,000FY21Q1FY21Q3
54AC Water & Sewer Group 1051 (W)B18091PUD SewerDesign Bid Build$776,300$1,004,600FY21Q2FY21Q4
55AC Water & Sewer Group 1051 (S)B18098PUD SewerDesign Bid Build$3,136,600$4,059,100FY21Q2FY21Q4
56AC Water & Sewer Group 1036 (W)B18121PUD SewerDesign Bid Build$3,322,800$4,300,100FY21Q2FY21Q4
57AC Water & Sewer Group 1036 (S)B18123PUD SewerDesign Bid Build$525,900$652,800FY21Q2FY21Q4
58Coronado SB (27th SB-Madden)Rd Imp UU193B18137TSWDesign Bid Build$268,213$337,203FY21Q1FY21Q3
5932nd St PHII (Market-Imp.) Rd Imp UU17B18141TSWDesign Bid Build$268,213$337,203FY21Q1FY21Q3
60Block 6DD1 (Clairemont Mesa)Rd Imp UU410B18142TSWDesign Bid Build$1,473,215$1,884,016FY21Q1FY21Q3
6132nd St PH I (Market-F St) Rd Imp UU386B18144TSWDesign Bid Build$124,122$154,689FY21Q1FY21Q3
6231st Street (Market-L ST) Rd Imp UU11B18147TSWDesign Bid Build$286,745$366,702FY21Q1FY21Q3
63Cass (Grand-Pacific Bch Dr) Rd Imp UU143B18148TSWDesign Bid Build$109,924$140,575FY21Q1FY21Q3
6425th (SB) (Coronado-Grove) Rd Imp UU995B18150TSWDesign Bid Build$88,173$112,761FY21Q1FY21Q3
65Hughes St (58th St-Jodi St) Rd Imp UU101B18151TSWDesign Bid Build$208,247$266,317FY21Q1FY21Q3
66Block 1M (La Jolla 4) Rd Imp UU659B18155TSWDesign Bid Build$817,563$1,087,358FY21Q1FY21Q3
6754th-Market to Santa margarita SidwlkB18158Transportation and Storm Water Department - Street DivisionDesign Bid Build$394,900$694,100FY21Q1FY21Q3
68ADACA Woodman St-Cielo to Pagel Pl SidwlB18159Transportation and Storm Water Department - Storm Water DivisionDesign Bid Build$525,261$926,800FY21Q2FY21Q4
69Talmadge AC Water Main ReplacementB18197PUD WaterDesign Bid Build$814,100$1,194,100FY21Q2FY21Q4
70Clairemont Mesa E Improv 1 (W)B18200PUD WaterDesign Bid Build$2,194,500$2,927,200FY21Q3FY21Q4
71Clairemont Mesa E Improv 1 (S)B18202PUD SewerDesign Bid Build$4,017,500$5,327,700FY21Q3FY21Q4
72Pipeline Rehabilitation AY-1B18212PUD SewerDesign Bid Build$6,561,800$7,841,500FY20Q4FY21Q2
73Adult Fitness Course East ShoreB18223Parks & Recreation DepartmentDesign Bid Build$1,060,000$1,954,000FY20Q4FY21Q1
74Tecolote North Parking Lot ImprovementsB18231Parks & Recreation DepartmentDesign Bid Build$444,000$869,000FY20Q4FY21Q1
75Tecolote North Playground ImprovementsB18232Parks & Recreation DepartmentDesign Bid Build$1,269,010$1,780,000FY20Q4FY21Q1
76Tecolote North Comfort Station ImpB18233Parks & Recreation DepartmentDesign Bid Build$1,032,300$1,963,000FY20Q4FY21Q1
77OB Dog Beach Accessibility ImprovementsB19000Parks & Recreation DepartmentJob Order Contract$759,806$1,143,306FY20Q4FY21Q1
78Sidewalk Replacement Group 1902-CM & LJB19013TSWDesign Bid Build$2,500,000$3,000,000FY20Q4FY21Q1
79Sidewalk Replacement Group 1903-SE & CHB19014TSWDesign Bid Build$1,000,000$1,400,000FY20Q4FY21Q1
80Tecolote South Comfort Station ImpB19015Parks & Recreation DepartmentDesign Bid Build$1,012,320$1,931,000FY20Q4FY21Q1
81Tecolote South Parking Lot ImprovementsB19017Parks & Recreation DepartmentDesign Bid Build$263,625$528,000FY20Q4FY21Q1
82Crown Point Playground ImprovementsB19021Parks & Recreation DepartmentDesign Bid Build$1,077,924$1,960,000FY21Q1FY21Q3
83Crown Point Parking Lot ImprovementsB19022Parks & Recreation DepartmentDesign Bid Build$907,500$1,557,000FY21Q1FY21Q3
84Santa Clara Playground ImprovementsB19029Parks & Recreation DepartmentDesign Bid Build$1,377,009$1,960,000FY20Q4FY21Q2
85Santa Clara Comfort Station ImprovementsB19032Parks & Recreation DepartmentDesign Bid Build$506,137$750,000FY20Q4FY21Q2
86SBWRP Variable Frequency Drive ReplB19066PUD SewerDesign Bid Build$104,000$955,500FY20Q4FY21Q3
87Bay Ho Improv 1 (S)B19088PUD SewerDesign Bid Build$5,068,300$8,465,000FY20Q4FY21Q2
88Accelerated MH Referral Group 1B19097PUD SewerDesign Bid Build$690,745$913,548FY21Q1FY21Q2
89Sewer Rehab 1051AB19145PUD SewerDesign Bid Build$126,200$178,200FY21Q2FY21Q4
90Sunset Point Parking Lot ImprovementsB19159Parks & Recreation DepartmentJob Order Contract$250,000$450,000FY21Q3FY21Q4
91AC Water and Sewer Group 1052A (W)B19166PUD WaterMultiple Award Construction Contract$3,502,400$5,182,900FY21Q2FY21Q4
92AC Water & Sewer Group 1052A (S)B19169PUD SewerMultiple Award Construction Contract$1,923,000$2,814,100FY21Q2FY21Q4
93Storm Drain at MBCB19197PUD SewerDesign Bid Build$2,260,800$3,481,800FY21Q3FY21Q4
94AC Water & Sewer Group 1023BB19204PUD WaterDesign Bid Build$200,000$326,000FY20Q3FY21Q1
95AC Water & Sewer Group 1023BB19205PUD WaterDesign Bid Build$2,000,000$2,941,000FY20Q3FY21Q1
96Concrete Street Panel Repl - Coast BlB20046Transportation and Storm Water Department - Street DivisionDesign Bid Build$1,052,686$1,437,264FY20Q4FY21Q1
97Coast Cave SD Accelerated ReplacementB20076Transportation and Storm Water Department - Street DivisionDesign Bid Build$223,095$313,423FY20Q4FY21Q1
98Chollas Large Car WashesL14002.3Fleet ServicesDesign Bid Build$1,650,000$2,748,370FY21Q2FY21Q3
99Chollas Crane ReplacementL14002.4Fleet ServicesDesign Bid Build$300,000$555,000FY21Q1FY21Q1
100Chollas Paint BoothL14002.5Fleet ServicesDesign Bid Build$303,000$666,000FY21Q1FY21Q3
101PD Substation Small CarwashesL14002.6Fleet ServicesDesign Bid Build$2,200,000$3,488,516FY21Q2FY21Q3
102Clay Street Mini Park ImprovementL16000.5Parks & Recreation DepartmentDesign Bid Build$663,000$1,228,930FY20Q3FY21Q1
103Miramar Landfill Trailer ReplacementsL17000.6Environmental ServicesSole Source$1,500,000$2,000,000FY21Q2FY21Q2
104Miramar Landfill Storm Water Basin ImprovementsL18002.3Environmental ServicesDesign Bid Build$6,000,000$8,000,000FY21Q1FY21Q3
105EMTS Boat Dock EsplanadeS00319PUD SewerDesign Bid Build$2,160,380$3,333,000FY20Q4FY21Q2
106Hickman Fields Athletic AreaS00751Parks & Recreation DepartmentDesign Bid Build$6,690,000$8,928,714FY20Q3FY21Q1
107SCRIPPS MIRAMAR RANCH LIBS00811Library DepartmentDesign Bid Build$4,270,000$6,076,377FY21Q2FY21Q4
108University Ave Mobility PlanS00915Transportation and Storm Water Department - Street DivisionDesign Bid Build$5,751,376$9,533,349FY20Q4FY21Q2
109Coastal Rail TrailS00951TSWDesign Bid Build$15,284,458$24,467,998FY21Q1FY21Q3
110FAIRBROO K NEIGHBORHOOD PARK - DEVELOPMENS01083Parks & Recreation DepartmentDesign Bid Build$4,366,673$6,045,539FY20Q4FY21Q1
111MBGC Clubhouse Demo/Prtbl Building InstlS01090Parks & Recreation DepartmentDesign Bid Build$4,770,578$6,463,816FY20Q3FY21Q1
112El Monte Pipeline No. 2S10008PUD WaterDesign Bid Build$17,900,000$24,500,000FY21Q1FY21Q3
113Olive St Park Acquisition and DevelpmentS10051Parks & Recreation DepartmentDesign Bid Build$1,659,494$3,271,585FY21Q4FY21Q4
114MBGC Irrigation & Electrical UpgradesS11010Parks & Recreation DepartmentDesign Bid Build$2,807,051$4,460,000FY20Q3FY21Q1
115La Paz Mini ParkS11103Parks & Recreation DepartmentDesign Bid Build$1,502,338$2,603,754FY20Q3FY21Q1
116Cielo & Woodman Pump StationS12012PUD WaterDesign Bid Build$4,678,000$6,678,000FY20Q3FY21Q1
117Alvarado 2nd Extension PipelineS12013PUD WaterDesign Bid Build$65,210,000$80,498,531FY21Q2FY21Q4
118El Cuervo Adobe ImprovementsS14006Parks & Recreation DepartmentJob Order Contract$273,480$606,000FY21Q2FY21Q4
119Salk Neighborhood Park & Joint Use DevelS14007Parks & Recreation DepartmentDesign Bid Build$4,376,686$6,036,686FY20Q4FY21Q2
120Pacific Highlands Ranch Branch LibraryS14023Library DepartmentDesign Bid Build$17,443,915$26,164,178FY20Q4FY21Q2
121Wangenheim Joint Use FacilityS15007Parks & Recreation DepartmentDesign Bid Build$6,386,396$9,190,353FY20Q4FY21Q2
122Tecolote Canyon Trunk Sewer ImprovementS15020PUD SewerDesign Bid Build$32,826,000$35,555,000FY21Q1FY21Q3
123Olive Grove Community Park ADA ImprovemeS15028Parks & Recreation DepartmentDesign Bid Build$1,050,000$1,617,849FY20Q4FY21Q1
124Egger/South Bay Comm Pk ADA ImprovementsS15031Parks & Recreation DepartmentDesign Bid Build$1,969,145$2,730,145FY21Q2FY21Q4
125Carmel Valley CP - Turf UpgradesS16029Parks & Recreation DepartmentDesign Bid Build$2,505,000$4,274,121FY21Q1FY21Q3
126Ocean Air CP Comfort Station & Park ImprS16031Parks & Recreation DepartmentDesign Bid Build$1,067,000$1,881,793FY21Q1FY21Q3
127Carmel Del Mar NP Comfort Station - DevS16034Parks & Recreation DepartmentDesign Bid Build$1,519,564$2,330,564FY20Q4FY21Q2
128Sage Canyon NP Concession Bldg-DevelopS16035Parks & Recreation DepartmentJob Order Contract$767,500$1,310,500FY21Q1FY21Q3
129Canon Street Pocket ParkS16047Parks & Recreation DepartmentDesign Bid Build$1,224,350$2,567,315FY20Q4FY21Q1
130Talmadge Traffic Calming InfrastructureS17001Parks & Recreation DepartmentDesign Bid Build$173,938$309,957FY21Q2FY21Q4
131North City Water Reclamation Plant Electrical UpgradesS17012Public UtilitiesDesign Bid Build$26,500,000$34,450,000FY21Q2FY21Q4
132MBC Equipment UpgradesS17013Public UtilitiesDesign Bid Build$30,109,800$39,956,000FY21Q2FY21Q4
133University Ave Complete StreetS18001Transportation and Storm Water Department - Street DivisionDesign Bid Build$4,330,300$6,718,400FY21Q3FY21Q4
134Harbor Drive Trunk Sewer ReplacementS18006PUD SewerDesign Bid Build$14,700,000$21,045,000FY21Q1FY21Q2
135Fire-Rescue Air Ops Facility - PH IIS18007Fire-Rescue Department (FS)Design Bid Build$13,000,000$15,000,000FY20Q2FY21Q2

Summary By Asset-Managing Departments

Asset-Managing DepartmentEstimated Construction Contract AwardEstimated Total Project Cost
Development Services Department$538,000$1,139,502
Library Department$21,713,915$32,240,555
Parks & Recreation Department$59,170,491$92,010,545
PUD Water$420,227,644$548,305,071
PUD Sewer$115,910,383$151,607,720
TSW$25,068,159$37,331,782
Transportation and Storm Water Department - Storm Water Division$8,939,111$14,372,550
Transportation and Storm Water Department - Street Division$15,824,187$24,675,755
Public Utilities$623,647,600$802,541,000
Street Division$8,200,000$12,710,000
Sustainability Department$9,000,000$30,000,000
Fleet Services$4,453,000$7,457,886
Environmental Services$7,500,000$10,000,000
Fire-Rescue Department (FS)$13,000,000$15,000,000
FY 2021 Total$1,333,192,490$1,779,392,366

*Estimated Advertise and Award Dates for Pure Water projects are to be determined

Archive of Anticipated CIP Projects