Data Date: July 1, 2020

To create the print version set the font-size:0.5em on both tables. Save as PDF in Chrome; More Settings - Margins:None and Scale:85. Also change link on https://www.sandiego.gov/cip/reports to match the year if starting with quarter 1.

This page contains all Capital Improvements Program (CIP) projects anticipated to be advertised and awarded for construction in the current fiscal year listed initially in the City'sProposed CIP Budget. This page is updated throughout the year with the current cost estimates and new projects to list. It also identifies which projects werealready awardedto a construction contractor. In addition, some projects from the original list may roll-over to the first quarter of next fiscal year and possibly beyond due to unforeseen conditions. SeeConstruction Contract Typesfor more information about delivery methods. Also, visitBid and Contract Opportunitiesfor projects currently in the bid and award phase For more information about this report, call (619) 533-4207 or emailengineering@sandiego.gov.

PDF icon PRINT - Forecast of Projects to be Awarded in Fiscal Year 2021 (Adopted Budget)

File DOWNLOAD - Forecast of Projects to be Awarded in Fiscal Year 2021 (Adopted Budget)

Asummary by asset-managing departmentsis listed at the bottom of this page.

*To sort on a column, click on its heading. To sort on multiple columns, hold the Shift key while clicking.

Line
Number
Project
Name
Project
Number
Asset Managing
Department
Contract
Type
Estimated
Contract
Cost ($)
Estimated
Total Project
Cost ($)
Fiscal Year
Advertising
Quarter
Advertising
Fiscal Year
Awarding
Quarter
Awarding
1Block 8R UUP21003599Transportation & Storm WaterDesign Bid Build$7,930,000$10,705,500FY20Q2FY21Q1
2Kearny Mesa Pipeline ManwayB00072Public UtilitiesDesign Bid Build$330,000$492,700FY21Q3FY21Q4
3Pomerado Park Reservoir UpgradeB00156Public UtilitiesDesign Bid Build$4,875,000$6,888,000FY21Q1FY21Q3
4Sewer & AC Water Group 763 (S)B00374Public UtilitiesDesign Bid Build$8,986,036$10,611,813FY21Q1FY21Q2
5Sewer and AC Water Group 793 (S)B00394Public UtilitiesDesign Bid Build$5,305,291$6,624,611FY21Q1FY21Q3
6SEWER GJ 798CB00409Public UtilitiesDesign Bid Build$212,420$484,380FY20Q4FY21Q2
7Sewer and AC Water Group 812 (S)B00426Public UtilitiesDesign Bid Build$3,047,000$4,030,000FY21Q1FY21Q3
8Fanuel St PI Archer to Tourmaline UUDB00721Transportation & Storm WaterJob Order Contract$90,344$142,047FY21Q1FY21Q1
9District 1 Block 1-J UUDB00836Transportation & Storm WaterJob Order Contract$422,809$771,809FY20Q3FY21Q1
10Stlight Design & Install 30th St - OceanB12001Transportation & Storm WaterJob Order Contract$107,100$126,000FY21Q1FY21Q2
11Water & Sewer Group 965 (S)B12048Public UtilitiesDesign Bid Build$1,855,400$2,932,600FY21Q2FY21Q4
12Water & Sewer Group 965 (W)B12057Public UtilitiesDesign Bid Build$1,769,500$2,934,600FY21Q2FY21Q4
13Signal Mods in Barrio LoganB13010Transportation & Storm WaterJob Order Contract$190,900$300,000FY21Q1FY21Q2
14Adams Ave (1620) Storm Drain ReplacementB13102Transportation & Storm WaterDesign Bid Build$500,000$868,000FY21Q2FY21Q4
15Water Group 968B14099Public UtilitiesDesign Bid Build$2,152,300$3,182,500FY21Q1FY21Q3
16Storm Drain Group 968B15028Transportation & Storm WaterDesign Bid Build$131,000$281,000FY21Q2FY21Q3
17Division St & Osborn St Traffic SignalB15047Transportation & Storm WaterJob Order Contract$212,200$275,000FY21Q2FY21Q4
18Pacific Beach TS Interconnect UpgradeB15065Transportation & Storm WaterJob Order Contract$933,030$1,841,619FY21Q1FY21Q2
19Sewer and AC Water Group 793 (W)B15070Public UtilitiesDesign Bid Build$677,900$964,700FY21Q1FY21Q3
20Block 1M1 UUP (La Jolla)B15084Transportation & Storm WaterJob Order Contract$252,450$297,000FY21Q1FY21Q2
21Hancock Street UUP (Witherby to TourquoiB15096Transportation & Storm WaterJob Order Contract$53,550$63,000FY21Q1FY21Q2
22Block 8R UUP - CIPB15097Transportation & Storm WaterDesign Bid Build$1,114,000$1,464,000FY20Q2FY21Q1
23Block 2S2 UUPB15098Transportation & Storm WaterJob Order Contract$260,100$306,000FY21Q1FY21Q2
24North City Pure Water FacilityB15139Public UtilitiesDesign Bid Build$416,828,625$493,083,000FY21Q1FY21Q3
25North City Pure Water Pump StationB15140Public UtilitiesDesign Bid Build$13,350,922$18,143,902FY21Q1FY21Q3
26Morena Pipelines - North (Package B3)B15141Public UtilitiesDesign Bid Build$86,345,000$103,626,000FY21Q1FY21Q3
27Morena Pump Station (Package A)B15141Public UtilitiesDesign Bid Build$93,975,000$126,443,000FY21Q1FY21Q3
28Nimitz Bridge at NTC RehabilitationB15198Transportation & Storm WaterDesign Bid Build$344,700$930,000FY20Q4FY21Q1
29Tecolote Cyn GC Water ConnB15203Public UtilitiesDesign Bid Build$229,000$278,000FY21Q3FY21Q4
30Pressure Reducing Stations Upgrades Phs1B16017Public UtilitiesDesign Bid Build$3,740,000$6,290,000FY21Q2FY21Q3
31Sewer Group 776AB16034Public UtilitiesDesign Bid Build$4,194,279$5,780,974FY20Q3FY21Q1
32North City Pure Water PipelineB16035Public UtilitiesDesign Bid Build$87,680,000$99,500,000FY21Q2FY21Q4
33North City Pure Water Subaqueous PipelineB16035Public UtilitiesDesign Bid Build$5,270,000$7,000,000FY21Q2FY21Q4
34ADA S/W Group 3E W Point LomaB16100Transportation & Storm WaterDesign Bid Build$538,000$1,139,502FY21Q1FY21Q3
35ADA S/W Group 4E CollegeB16107Transportation & Storm WaterDesign Bid Build$360,000$785,899FY20Q3FY21Q1
36ADA Curb Ramp Winder & McKeeB16108Transportation & Storm WaterDesign Bid Build$346,000$874,300FY20Q4FY21Q2
37Otay 2nd Pipeline Phase 3B16158Public UtilitiesDesign Bid Build$10,116,000$12,636,000FY21Q2FY21Q4
38El Cajon Bl-Highland-58th ImprovB17003Transportation & Storm WaterDesign Bid Build$643,000$1,215,050FY21Q1FY21Q3
39Murphy Canyon Trunk Sewer Repair/RehabB17005Public UtilitiesDesign Bid Build$12,378,317$16,393,110FY21Q1FY21Q3
40Mt Acadia (Mt Alifan-Mt Burnham)SL UU621B17012Transportation & Storm WaterJob Order Contract$205,200$228,000FY21Q1FY21Q2
41Seminole PH2 (El Cajon-Stanley) SL UU630B17013Transportation & Storm WaterJob Order Contract$108,000$120,000FY21Q1FY21Q2
42Citywide Street Lights Group 1701B17050Transportation & Storm WaterJob Order Contract$419,500$700,600FY21Q1FY21Q2
43Citywide Street Lights Group 1702B17051Transportation & Storm WaterJob Order Contract$441,200$731,500FY21Q1FY21Q2
44Market St. Water Pipe ReplacementB17052Public UtilitiesDesign Bid Build$1,522,584$2,026,802FY20Q3FY21Q1
45Market Street Sewer Pipe ReplacementB17054Public UtilitiesDesign Bid Build$338,850$553,397FY20Q3FY21Q1
46Fanuel St III (Grand-PB Dr) Rd Imp UU188B17071Transportation & Storm WaterDesign Bid Build$137,121$221,565FY20Q3FY21Q1
47Clairemont Mesa Sewer Pipe ReplacementB17087Public UtilitiesDesign Bid Build$186,000$346,100FY21Q3FY21Q4
48San Vicente PH I-II Rd Imp UU505-UU506B17098Transportation & Storm WaterDesign Bid Build$359,483$961,628FY20Q3FY21Q1
49Plumosa Park Series Circuit ConversionB17101Transportation & Storm WaterJob Order Contract$765,000$1,285,927FY21Q2FY21Q3
50Sewer and AC Water Group 1032 (S)B17104Public UtilitiesDesign Bid Build$6,389,000$8,518,000FY20Q3FY21Q2
51Sewer and AC Water Group 1032 (W)B17105Public UtilitiesDesign Bid Build$7,071,000$9,428,000FY20Q3FY21Q1
52Curb Ramp Improvement Group 1701B17114Transportation & Storm WaterDesign Bid Build$1,130,000$1,830,000FY21Q1FY21Q2
53Sewer and AC Water Group 812 (W)B17115Public UtilitiesDesign Bid Build$1,916,000$2,555,000FY21Q1FY21Q3
54Sewer and AC Water Group 763 (W)B17116Public UtilitiesDesign Bid Build$1,972,545$2,305,318FY21Q1FY21Q2
55Mid-City & Eastern Area Signal ModsB17128Transportation & Storm WaterJob Order Contract$389,086$629,860FY21Q3FY21Q4
56Balboa Park Pipeline Repl Ph II (S)B17133Public UtilitiesDesign Bid Build$1,852,000$3,043,651FY21Q2FY21Q4
57Balboa Park Pipeline Repl Ph II (W)B17140Public UtilitiesDesign Bid Build$3,790,000$6,319,547FY21Q2FY21Q4
58Torrey Pines Gf-Repr Storm Drain OutfallB17152Transportation & Storm WaterDesign Bid Build$2,135,000$3,360,000FY21Q1FY21Q3
59Palm Ave Storm DrainB17163Transportation & Storm WaterJob Order Contract$288,700$502,700FY20Q4FY21Q2
60Mission Beach Water & Sewer Repl (W)B17169Public UtilitiesDesign Bid Build$13,035,280$15,336,196FY20Q3FY21Q1
61Mission Beach Water & Sewer Repl (S)B17170Public UtilitiesDesign Bid Build$2,194,515$2,641,715FY20Q3FY21Q1
62Street Reconstruction Group 1801B17188Transportation & Storm WaterDesign Bid Build$8,200,000$12,710,000FY21Q2FY21Q4
63Sewer Group 843B17189Public UtilitiesDesign Bid Build$6,127,389$8,022,289FY21Q1FY21Q2
64Sherman Height Community Center PlaygroundB18006Parks & RecreationDesign Bid Build$350,000$697,000FY21Q2FY21Q4
65Intelligent Cities Outdoor Lightng Proj2B18036SustainabilityDesign Bid Build$9,000,000$30,000,000FY20Q2FY21Q1
66Sewer & AC Water Group 1034 (S)B18063Public UtilitiesDesign Bid Build$4,968,400$6,806,400FY21Q2FY21Q4
67Sewer & AC Water Group 1034 (W)B18064Public UtilitiesDesign Bid Build$6,959,100$9,201,600FY21Q2FY21Q4
68Convert Bldg 619 @ NTC into Rec CenterB18087Parks & RecreationDesign Bid Build$3,579,000$6,228,000FY21Q1FY21Q3
69AC Water & Sewer Group 1051 (W)B18091Public UtilitiesDesign Bid Build$776,300$1,004,600FY21Q2FY21Q4
70AC Water & Sewer Group 1051 (S)B18098Public UtilitiesDesign Bid Build$3,136,600$4,059,100FY21Q2FY21Q4
71Alvarado TS Water Main RelocationsB18104Public UtilitiesDesign Bid Build$10,000,000$10,438,400FY20Q3FY21Q1
72AC Water & Sewer Group 1036 (W)B18121Public UtilitiesDesign Bid Build$3,322,800$4,300,100FY21Q1FY21Q3
73AC Water & Sewer Group 1036 (S)B18123Public UtilitiesDesign Bid Build$525,900$652,800FY21Q1FY21Q3
74Ingulf St (Morena Bl-Erie St) SL UU123B18126Transportation & Storm WaterJob Order Contract$24,200$72,000FY21Q1FY21Q2
75Orange Av PH3 Central-Fairmont SL UU24B18130Transportation & Storm WaterJob Order Contract$53,200$107,600FY21Q1FY21Q2
76Asphalt Resurfacing Group 1901B18134Transportation & Storm WaterDesign Bid Build$9,746,100$11,466,000FY21Q1FY21Q2
77Asphalt Resurfacing Group 1902B18135Transportation & Storm WaterDesign Bid Build$2,552,801$3,003,295FY21Q1FY21Q2
78Howard PHI-II(Park-Texas) Rd Imp UU71-72B18136Transportation & Storm WaterDesign Bid Build$190,910$389,315FY20Q3FY21Q1
79Coronado SB (27th SB-Madden)Rd Imp UU193B18137Transportation & Storm WaterDesign Bid Build$268,213$337,203FY21Q2FY21Q3
80Wightman (Chamoune -Euclid) Rd Imp UU388B18138Transportation & Storm WaterDesign Bid Build$123,367$517,830FY20Q3FY21Q1
81Mission Bl(Loring-Turquoise) Rd Imp UU30B18140Transportation & Storm WaterDesign Bid Build$170,777$1,212,544FY20Q3FY21Q1
8232nd St PHII (Market-Imp.) Rd Imp UU17B18141Transportation & Storm WaterDesign Bid Build$268,213$337,203FY21Q2FY21Q3
83Block 6DD1 (Clairemont Mesa)Rd Imp UU410B18142Transportation & Storm WaterDesign Bid Build$1,473,215$1,884,016FY21Q2FY21Q3
8432nd St PH I (Market-F St) Rd Imp UU386B18144Transportation & Storm WaterDesign Bid Build$124,122$154,689FY21Q2FY21Q3
8531st Street (Market-L ST) Rd Imp UU11B18147Transportation & Storm WaterDesign Bid Build$286,745$366,702FY21Q2FY21Q3
86Cass (Grand-Pacific Bch Dr) Rd Imp UU143B18148Transportation & Storm WaterDesign Bid Build$109,924$140,575FY21Q2FY21Q3
87Golfcrest(Jackson-Wandermere)Rd ImpUU584B18149Transportation & Storm WaterDesign Bid Build$221,988$428,009FY20Q3FY21Q1
8825th (SB) (Coronado-Grove) Rd Imp UU995B18150Transportation & Storm WaterDesign Bid Build$88,173$112,761FY21Q2FY21Q3
89Hughes St (58th St-Jodi St) Rd Imp UU101B18151Transportation & Storm WaterDesign Bid Build$208,247$266,317FY21Q2FY21Q3
90Hilltop PH I(Boundary-Toyne)Rd Imp UU617B18153Transportation & Storm WaterDesign Bid Build$235,392$622,463FY20Q3FY21Q1
91Block 1M (La Jolla 4) Rd Imp UU659B18155Transportation & Storm WaterDesign Bid Build$817,563$1,087,358FY21Q2FY21Q3
92Thermal Ave - Donax Ave to Palm Ave SidewalkB18157Transportation & Storm WaterDesign Bid Build$1,270,300$1,609,100FY21Q2FY21Q4
93Accelerated Pipeline Rehab Ref Group 846B18185Public UtilitiesDesign Bid Build$1,005,500$1,216,200FY20Q4FY21Q2
94Talmadge AC Water Main ReplacementB18197Public UtilitiesDesign Bid Build$814,100$1,194,100FY21Q2FY21Q4
95Pipeline Rehabilitation AY-1B18212Public UtilitiesDesign Bid Build$6,561,800$7,841,500FY20Q4FY21Q2
96Adult Fitness Course East ShoreB18223Parks & RecreationDesign Bid Build$1,060,000$1,954,000FY21Q1FY21Q2
97Tecolote North Parking Lot ImprovementsB18231Parks & RecreationDesign Bid Build$706,160$869,000FY21Q1FY21Q2
98Tecolote North Playground ImprovementsB18232Parks & RecreationDesign Bid Build$1,469,984$1,780,000FY21Q1FY21Q2
99Tecolote North Comfort Station ImpB18233Parks & RecreationDesign Bid Build$1,639,422$1,963,000FY21Q1FY21Q2
100OB Dog Beach Accessibility ImprovementsB19000Parks & RecreationJob Order Contract$759,806$1,143,306FY20Q4FY21Q1
101MLK Rec Center Moisture IntrusionB19001Parks & RecreationDesign Bid Build$1,020,093$1,868,352FY21Q1FY21Q2
102Miramar Ranch North Paving G1B19007Transportation & Storm WaterDesign Bid Build$3,925,870$5,000,000FY20Q4FY21Q1
103Sidewalk Replacement Group 1902B19013Transportation & Storm WaterDesign Bid Build$3,200,000$3,800,000FY21Q4FY21Q4
104Sidewalk Replacement Group 1903-SE & CHB19014Transportation & Storm WaterDesign Bid Build$1,000,000$1,300,000FY21Q2FY21Q2
105Tecolote South Comfort Station ImpB19015Parks & RecreationDesign Bid Build$1,608,085$1,931,000FY21Q1FY21Q2
106Tecolote South Playground ImprovementsB19016Parks & RecreationDesign Bid Build$2,537,976$3,027,000FY21Q1FY21Q2
107Tecolote South Parking Lot ImprovementsB19017Parks & RecreationDesign Bid Build$419,282$528,000FY21Q1FY21Q2
108Crown Point Playground ImprovementsB19021Parks & RecreationDesign Bid Build$1,077,924$1,960,000FY21Q2FY21Q4
109Crown Point Parking Lot ImprovementsB19022Parks & RecreationDesign Bid Build$907,500$1,557,000FY21Q2FY21Q4
110Santa Clara Playground ImprovementsB19029Parks & RecreationDesign Bid Build$1,377,009$1,960,000FY21Q1FY21Q3
111Santa Clara Comfort Station ImprovementsB19032Parks & RecreationDesign Bid Build$506,137$750,000FY21Q1FY21Q3
112Linda Vista Skate Park Phase 2B19062Parks & RecreationJob Order Contract$168,700$348,900FY21Q1FY21Q2
113SBWRP Variable Frequency Drive ReplB19066Public UtilitiesDesign Bid Build$550,000$750,000FY20Q4FY21Q1
114City Heights Pool ReconstructionB19068Parks & RecreationDesign Bid Build$5,502,229$6,781,682FY20Q4FY21Q1
115Bay Ho Improv 1 (S)B19088Public UtilitiesDesign Bid Build$5,208,400$7,024,800FY21Q1FY21Q3
116Accelerated MH Referral Group 1B19097Public UtilitiesDesign Bid Build$515,000$742,000FY21Q3FY21Q4
117Citywide Street Lights 1950B19125Transportation & Storm WaterJob Order Contract$1,350,000$1,490,000FY21Q2FY21Q2
118Downtown Complete St Impl Phase 2B19143Transportation & Storm WaterDesign Bid Build$1,792,937$3,341,565FY20Q2FY21Q1
119Sewer Rehab 1051AB19145Public UtilitiesDesign Bid Build$126,200$178,200FY21Q2FY21Q4
120Sunset Point Parking Lot ImprovementsB19159Parks & RecreationJob Order Contract$250,000$450,000FY21Q2FY21Q3
121AC Water and Sewer Group 1052A (W)B19166Public UtilitiesMultiple Award Construction Contract$3,502,400$5,182,900FY21Q2FY21Q4
122AC Water & Sewer Group 1052A (S)B19169Public UtilitiesMultiple Award Construction Contract$1,923,000$2,814,100FY21Q2FY21Q4
123Pipeline Rehabilitation BB-1B19201Public UtilitiesDesign Bid Build$6,871,000$8,600,000FY21Q2FY21Q4
124AC Water & Sewer Group 1023BB19204Public UtilitiesJob Order Contract$200,000$326,000FY21Q2FY21Q4
125AC Water & Sewer Group 1023BB19205Public UtilitiesJob Order Contract$2,000,000$2,941,000FY21Q2FY21Q4
126Pipeline Rehabilitation BA-1B20014Public UtilitiesDesign Bid Build$5,137,000$6,788,300FY21Q3FY21Q4
127San Diego Av (Old Town-McKee) SL UU598B20045Transportation & Storm WaterJob Order Contract$82,200$168,000FY21Q1FY21Q2
128Concrete Street Panel Repl - Coast BlB20046Transportation & Storm WaterDesign Bid Build$829,591$1,400,656FY21Q1FY21Q2
129Coast Cave SD Accelerated ReplacementB20076Transportation & Storm WaterDesign Bid Build$223,095$313,423FY21Q1FY21Q2
130Tierrasanta Pool Stairway ReplacementB20115Real Estate Assets - FacilitiesJob Order Contract$222,271$257,271FY20Q3FY21Q1
131Rolando Improv 1 (W)B20126Public UtilitiesDesign Bid Build$4,336,300$6,201,100FY21Q2FY21Q4
132Rancho Penasquitos Paving Group 1B20138Transportation & Storm WaterJob Order Contract$3,286,393$3,779,352FY20Q4FY21Q1
133High Purity Oxygen Addition System PQPSB21001Public UtilitiesDesign Bid Build$1,933,000$2,416,250FY21Q2FY21Q4
134Chollas Large Car WashesL14002.3Fleet ServicesDesign Bid Build$1,650,000$2,748,370FY21Q3FY21Q4
135Chollas Crane ReplacementL14002.4Fleet ServicesDesign Bid Build$300,000$555,000FY21Q1FY21Q2
136Chollas Paint BoothL14002.5Fleet ServicesDesign Bid Build$303,000$666,000FY21Q1FY21Q2
137PD Substation Small CarwashesL14002.6Fleet ServicesDesign Bid Build$2,200,000$3,488,516FY21Q3FY21Q4
138Island Ave Mini Park ImprovementsL16000.2Parks & RecreationDesign Bid Build$2,162,000$3,227,650FY20Q4FY21Q2
139Clay Street Mini Park ImprovementL16000.5Parks & RecreationDesign Bid Build$920,000$1,565,930FY20Q4FY21Q2
140J Street Mini Park ImprovementL16000.6Parks & RecreationDesign Bid Build$847,913$1,500,000FY20Q1FY21Q1
141Miramar Landfill Trailer ReplacementsL17000.6Environmental ServicesDesign Build$300,000$400,000FY21Q2FY21Q3
142Miramar Landfill Storm Water Basin ImprovementsL18002.3Environmental ServicesDesign Bid Build$6,000,000$8,000,000FY21Q2FY21Q3
143EMTS Boat Dock EsplanadeS00319Public UtilitiesDesign Bid Build$2,160,380$3,333,000FY21Q1FY21Q2
144Hickman Fields Athletic AreaS00751Parks & RecreationDesign Bid Build$7,200,000$9,566,318FY21Q1FY21Q3
145SCRIPPS MIRAMAR RANCH LIBS00811LibraryDesign Bid Build$4,270,000$6,076,377FY21Q2FY21Q4
146University Ave Mobility PlanS00915Transportation & Storm WaterDesign Bid Build$5,974,533$9,277,310FY21Q1FY21Q3
147Coastal Rail TrailS00951Transportation & Storm WaterDesign Bid Build$15,284,458$24,467,998FY21Q2FY21Q4
148FAIRBROO K NEIGHBORHOOD PARK - DEVELOPMENS01083Parks & RecreationDesign Bid Build$3,535,354$6,045,539FY20Q3FY21Q1
149MBGC Clubhouse Demo/Prtbl Building InstlS01090Parks & RecreationDesign Bid Build$4,770,578$7,400,000FY21Q1FY21Q3
150Olive St Park Acquisition and DevelpmentS10051Parks & RecreationDesign Bid Build$1,983,000$4,443,500FY21Q1FY21Q2
151MBGC Irrigation & Electrical UpgradesS11010Parks & RecreationDesign Bid Build$2,807,051$4,460,000FY21Q1FY21Q3
152La Paz Mini ParkS11103Parks & RecreationDesign Bid Build$1,502,338$2,603,754FY21Q1FY21Q3
153Alvarado 2nd Extension PipelineS12013Public UtilitiesDesign Bid Build$65,210,000$80,498,531FY21Q2FY21Q4
154El Cuervo Adobe ImprovementsS14006Parks & RecreationJob Order Contract$273,480$606,000FY21Q2FY21Q4
155Salk Neighborhood Park & Joint Use DevelS14007Parks & RecreationDesign Bid Build$5,576,686$7,236,686FY21Q1FY21Q2
156Pacific Highlands Ranch Branch LibraryS14023LibraryDesign Bid Build$17,443,915$26,164,178FY21Q1FY21Q3
157Wangenheim Joint Use FacilityS15007Parks & RecreationDesign Bid Build$6,386,396$9,190,353FY21Q1FY21Q2
158La Jolla Village/I-805 Landscape MaintS15017Transportation & Storm WaterDesign Bid Build$358,000$550,000FY20Q4FY21Q1
159Alvarado Trunk Sewer Phase IVS15019Public UtilitiesDesign Bid Build$55,000,000$67,000,000FY20Q3FY21Q1
160Tecolote Canyon Trunk Sewer ImprovementS15020Public UtilitiesDesign Bid Build$32,826,000$35,555,000FY21Q3FY21Q4
161Olive Grove Community Park ADA ImprovemeS15028Parks & RecreationDesign Bid Build$2,386,895$3,437,268FY21Q1FY21Q2
162Egger/South Bay Comm Pk ADA ImprovementsS15031Parks & RecreationDesign Bid Build$1,969,145$2,730,145FY21Q3FY21Q4
163Carmel Del Mar NP Comfort Station - DevS16034Parks & RecreationDesign Bid Build$1,519,564$2,330,564FY21Q2FY21Q3
164Sage Canyon NP Concession Bldg-DevelopS16035Parks & RecreationJob Order Contract$767,500$1,310,500FY21Q1FY21Q4
165Torrey Highlands NP UpgradesS16036Parks & RecreationDesign Bid Build$660,000$1,027,937FY20Q4FY21Q1
166Canon Street Pocket ParkS16047Parks & RecreationDesign Bid Build$1,224,350$2,567,315FY21Q2FY21Q4
167Market Street-47th to Euclid-Complete StreetS16061Transportation & Storm WaterDesign Bid Build$6,704,673$9,805,084FY20Q3FY21Q1
168Talmadge Traffic Calming InfrastructureS17001Parks & RecreationDesign Bid Build$173,938$309,957FY21Q2FY21Q4
169University Ave Complete StreetS18001Transportation & Storm WaterDesign Bid Build$4,838,300$7,426,400FY21Q2FY21Q4
170Harbor Drive Trunk Sewer ReplacementS18006Public UtilitiesDesign Bid Build$14,700,000$21,045,000FY21Q1FY21Q2
171Fire-Rescue Air Ops Facility - PH IIS18007Fire-RescueDesign Build$13,000,000$15,000,000FY20Q2FY21Q2
172AC Overlay Group 2010 PeninsulaTBDTransportation & Storm WaterDesign Bid Build$6,871,844$8,084,523FY21Q1FY21Q2
173AC Overlay Group 2011 Rancho BeranardoTBDTransportation & Storm WaterDesign Bid Build$6,972,676$8,203,148FY21Q1FY21Q2
174AC Overlay Group 2012 MM/RPTBDTransportation & Storm WaterDesign Bid Build$3,992,691$4,697,284FY21Q3FY21Q3
175AC Overlay Group 2013 La Jolla PkwyTBDTransportation & Storm WaterDesign Bid Build$3,778,773$4,445,616FY21Q1FY21Q2
176AC Overlay Group 2014 SouthwestTBDTransportation & Storm WaterDesign Bid Build$8,884,200$10,452,000FY21Q3FY21Q4
177AC Overlay Group 2015 SoutheastTBDTransportation & Storm WaterDesign Bid Build$7,094,100$8,346,000FY21Q3FY21Q4
178AC Overlay Group 2016 Navajo G2TBDTransportation & Storm WaterDesign Bid Build$4,707,300$5,538,000FY21Q3FY21Q3
179Sidewalk Replacement Group 2030TBDTransportation & Storm WaterDesign Bid Build$1,500,000$1,800,000FY21Q3FY21Q4

Summary By Asset-Managing Departments

Asset-Managing DepartmentEstimated Construction Contract AwardEstimated Total Project Cost
Transportation & Storm Water$21,108,698$32,125,173
Public Utilities$97,060,015$118,245,390
Fleet Services$4,453,000$7,457,886
Environmental Services$6,300,000$8,400,000
Sustainability$9,000,000$30,000,000
Parks & Recreation$71,605,494$107,355,656
Real Estate Assets - Facilities$222,271$257,271
Library$21,713,915$32,240,555
Fire-Rescue$13,000,000$15,000,000
Public Utilities$952,922,317$1,169,281,494
Transportation & Storm Water$118,783,860$161,343,670
FY 2021 Total$1,316,169,569$1,681,707,095

*Estimated Advertise and Award Dates for Pure Water projects are to be determined

Archive of Anticipated CIP Projects