Final Environmental Documents
The following final environmental documents prepared by the City of San Diego are available to view or download. Each final document includes:
- A revised document (as necessary);
- Comments received during the public comment period; and
- A list of commenters and responses to each comment.
(La Jolla) Herschel Avenue / Project No. 632775
Posted by Development Services Department
(Navajo) Pipeline Rehabilitation BA-1 / Project No. 660676
Posted by Development Services Department
(North Park) Addendum to North Park Community Plan Update EIR
(North Park) Addendum to North Park Community Plan Update Environmental Impact Report (Project No. 380611/SCH No. 2013121076) for Land Use and Zoning change of 3.5 acre
Posted by City Planning Department
(Kearny Mesa) Kearny Mesa Community Plan Update / Project No. 607857 / Final Program Environmental Impact Report
- (Kearny Mesa) Kearny Mesa Community Plan Update / Project No. 607857 / Final PEIR
- (Kearny Mesa) Kearny Mesa Community Plan Update / Project No. 607857 / Draft PEIR
- Appendix A: Notice of Preparation (NOP) and Comments on the NOP
- Appendix B: Air Quality Technical Report
- Appendix C: Biological Resources Report
- Appendix D: Desktop Geotechnical and Geologic Hazard Evaluation
- Appendix E: Greenhouse Gas Emissions Technical Report
- Appendix F: Cultural Resources Constraints and Sensitivity Analyses
- Appendix G: Historic Context Statement
- Appendix H: Hazardous Materials Technical Study
- Appendix I: Hydrology and Water Quality Technical Report
- Appendix J: Noise Technical Report
- Appendix K: Water and Wastewater Summary
- Appendix L: Water Supply Assessment
- Appendix M: Transportation Impact Study
- Appendix N: Paleontological Resource Assessment
Posted by City Planning Department
(Black Mountain Ranch) Avion Property / Project No. 598173
- Errata August 28, 2020
- Findings of Fact and Statement of Overriding Considerations
- Supplemental Environmental Impact Report
- Appendix A: Black Mountain Ranch EIR Subarea I
- Appendix B: NOP
- Appendix C: Biological Resources Report
- Appendix D-1: Historical Resources Survey Report
- Appendix D-2: Cultural Test Results
- Appendix E: Design Review Guideline for Avion
- Appendix F: Air Quality Analysis
- Appendix G: Noise Analysis
- Appendix H: Traffic Memo
- Appendix I:Preliminary Drainage Report
- Appendix J: Storm Water Management Quality Management Plan
- Appendix K: Preliminary Hydromodification Management Study
- Appendix L-1: Geologic Reconnaissance
- Appendix L-2: Geotechnical Investigation
- Appendix L-3: Response to Geotech Comments 10-23-2018
- Appendix L-4: Response to Geotech Comments 04-01-2019
- Appendix M: Water System Analysis
- Appendix N: Sewer System Analysis
- Appendix O: Waste Management Plan
- Appendix P: Phase I Environmental Assessment
Posted by Development Services Department
(Mira Mesa) 3Roots / Project No. 587128
- Environmental Impact Report Part 1
- Environmental Impact Report Part 2
- Environmental Impact Report Part 3
- Findings of Fact and Statement of Overriding Considerations
- Appendix A: Notice of Preparation - Scoping Meeting Transcript-Comment Letters
- Appendix B: Transportation Impact Analysis
- Appendix C: Air Quality Technical Report
- Appendix D: CAP Consistency Checklist
- Appendix E: Acoustical Analysis Report
- Appendix F: Geotechnical Reports
- Appendix G: Biological Technical Report
- Appendix H: Long-term Habitat Management Plant Report
- Appendix I: Jurisdictional Delineation Report
- Appendix J: Archaelogical Resources Report Form
- Appendix K: Phase I Environmental Site Assessment Part 1
- Appendix K: Phase I Environmental Site Assessment Part 2
- Appendix K: Phase I Environmental Site Assessment Part 3
- Appendix L: Phase II Environmental Site Assessment
- Appendix M: Water Supply Assessment Report
- Appendix N: Water Study
- Appendix O: Sewer Study & Sewer Flow Addendum
- Appendix P: Waste Management Plan
- Appendix Q: Preliminary Drainage Report
- Appendix R1: Preliminary Hydromodification Management Study
- Appendix R2: Hydraulic Analyses
- Appendix S: Storm Water Quality Management Plan Part 1
- Appendix S: Storm Water Quality Management Plan Part 2
- Appendix T: Master Planned Development Permit Part 1
- Appendix T: Master Planned Development Permit Part 2
- Appendix T: Master Planned Development Permit Part 3
- Appendix T: Master Planned Development Permit Part 4
- Appendix T: Master Planned Development Permit Part 5
- Appendix U: Additional Center Line BRT Analysis
Posted by Development Services Department
(Old Town) Congress Street Parking / Project No. 634652
Posted by Development Services Department
(Carmel Moutain Ranch) Alante CPA PDP RZ / Project No. 648597
- Errata Date 7-10-2020
- Addendum
- Negative Declaration No. 90-0687
- Climate Action Plan Consistency Checklist
- Drainage Study
- Noise Impact Analysis
- Storm Water Requirements Applicability Checklist
- Transportation Impact Analysis & Technical Appendices
Posted by Development Services Department
(Torrey Pine) EPB Residence Remodel CDP / Project No. 640358
Posted by Development Services Department
(La Jolla) Concrete Street Panel Replacement Coast Boulevard CDP SDP / Project No. 651033
Posted by Development Services Department
(Balboa Park) Balboa Park Pipeline Replacement Phase II / Project No. 635078
Posted by Development Services Department
(Peninsula) Hotel Point Loma CDP SDP NDP / Project No. 612853
- Mitigated Negative Declaration
- Drainage Report
- Storm Water Quality Management Plan
- Transportation Impact Analysis
- Waste Management Plan
Posted by Engineering & Capital Projects
(Uptown) ERB-Creamer / Project No. 595127
- Addendum
- Mtitigated Negative Declaration No. 62130
- Biological Report
- Geotechnical Investigation Report
- Geotechnical Investigation Comments
- Preliminary Drainage Study
Posted by Development Services Department
(Citywide) General Plan Recreation Element Update
Appendices to the General Plan Program Environmental Impact Reportare available upon request.
Posted by City Planning Department
(Mission Beach) South Mission Beach Storm Drain and Green Infrastructure / Project No. 646245
- Mitigated Negative Declaration
- Biological Resources Report
- Geotechnical Investigation Report
- Storm Drain Improvements and Green Infrastructure Report
Posted by Development Services Department
(Tijuana River Valley) AT&T Tijuana River Valley / Project No. 621894
Posted by Development Services Department
(La Jolla) Pipeline Rehab AY-1 / Project No. 649027
Posted by Development Services Department
(Clairemont Mesa) 1398 Lieta Street / Project No. 512890
- Errata August 19, 2020
- Mitigated Negative Declaration
- Acoustical Report
- Climate Action Plan Consistency Checklist
- Geotechnical Infiltration Feasibility Study
- Geotechnical Investigation Report
- Hydrology Study
- Storm Water Quality Managemnt Plan
Posted by Development Services Department
(City Heights) NHA Education Facility CUP / Project No. 623590
- Mitigated Negative Declaration
- Air Quality Technical Report
- Drainage Study
- Geotechnical Report
- Noise Report
- Storm Water Quality Managementa Plan
Posted by Development Services Department