INFORMATION BULLETIN
182

INFORMATION BULLETIN 182

How to Obtain a Permit for Private Utilities

This Information Bulletin describes the procedure for obtaining a permit to install private underground for domestic water and sewer.

Revised


INFORMATION BULLETIN
185

INFORMATION BULLETIN 185

How to Obtain an Address/Address Change

How to assign a new address for new projects or to request a change to an existing address.

Revised


INFORMATION BULLETIN
187

INFORMATION BULLETIN 187

How to Obtain a Permit for Electrical Vehicle Charging Systems

Permitting procedures for the installation of Electric Vehicle Charging Systems (EVCS) on existing sites or buildings.

Revised


INFORMATION BULLETIN
188

INFORMATION BULLETIN 188

Deferred Submittals

Identifies building elements that qualify for deferred submittal and establishes related submittal procedures.

Revised


INFORMATION BULLETIN
189

INFORMATION BULLETIN 189

Partial Permits

Submittal requirements for partial permits used when construction of an individual structure is divided into phases.

Revised


INFORMATION BULLETIN
190

INFORMATION BULLETIN 190

How to Obtain a Permit for a Shell Building

This Information Bulletin covers the procedures for obtaining permits for new shell buildings and existing buildings or portions of buildings returning to a shell configuration.

Revised


INFORMATION BULLETIN
191

INFORMATION BULLETIN 191

Standard Notes for Building Permits

The following Information Bulletin contains the most common standard notes that Development Services Department (DSD) requires to be located on building permit plans. This list is provided in order to help applicants comply with the with the San Diego Municipal Code and the California Building Standards. Note that only comments applicable to the specific project need to be added to plans.

(Best viewed in Microsoft Word 2013 or newer)

Revised


INFORMATION BULLETIN
195

INFORMATION BULLETIN 195

Affordable Housing Permit Now Program

This information bulletin describes the program for processing priority housing projects according to an enhanced approach called Affordable Housing Permit Now.

Revised


INFORMATION BULLETIN
201

INFORMATION BULLETIN 201

How to Obtain a Permit for a Fireplace

This Information Bulletin describes the minimum requirements for obtaining a permit for a fireplace in residential buildings.

 

Revised


INFORMATION BULLETIN
203

INFORMATION BULLETIN 203

No-Plan Building Permit

This Information Bulletin establishes the procedure for the type of work which are eligible to obtain a building permit without a plan review for conformance with current building codes.

Revised