Skip to main content

Capital Improvements Program (CIP)

Ocean Beach Pier Renewal

 

Ocean Beach Pier Background

The Ocean Beach (OB) Pier first opened on July 2, 1966. Conceived as a sportfishing pier, the facility enables the public to access and interact with the ocean. There is no fee for walking out onto the pier and fishing licenses are not required.

During the first 25 years of service, the structure received normal ongoing maintenance required by exposure to the harsh marine environment, where it is subjected to wind, waves and the salt‐laden marine atmosphere. In 1991, the pier underwent major structural rehabilitation. Since the early 2000s, exposure to large waves and ongoing degradation has required structural repairs with increasing frequency. The pier has been temporarily closed several times in recent years due to damage suffered in storms and high surf. In 2023, the pier was closed from January to July, reopening just in time for its 57th anniversary. But high surf in October damaged the pier and forced it to close again. Given the overall cost, timeline, and environmental permitting required to structurally rehabilitate the existing pier, in addition to the likelihood of additional damage occurring during future winter storms, City engineers have determined that any significant structural rehabilitation is not feasible. At this time, the City has decided to leave the pier as is and move forward with plans for a long-term replacement of the pier. 

While the pier does not pose an immediate threat to public safety, additional signage has been posted along the pier reminding visitors to be cautious when visiting the area. It references the San Diego Municipal Code which states it is against the law for anyone to swim, wade, surf or skin dive within 75 feet of any fishing pier owned or operated by the City (SDMC §63.20.16).

Based on the findings of a 2018 study of the OB Pier, the City has determined that pursuing a potential replacement of the pier is the best option considering the ongoing costs of repairs, the need to modernize the existing facility and the anticipation of future sea level rise. The 2018 study by consultant Moffatt & Nichol examined the damage and deterioration of the structure and analyzed three options for the future of the pier: repair, rehabilitate or replace. The study documented various structural problems with the pier and determined that it has reached the end of its service life.


Project Description

This project aims to provide a long-term solution for the 58-year-old pier through a potential replacement.

This City is working with Moffatt & Nichol to design the preferred alternative for the potential replacement of the pier based on input from San Diegans, community impacts, environmental permitting, sustainability, operational usage, cost, historical significance and other factors. The City will host a series of upcoming community workshops to share information about the project and gather input from community members.

A task force was created to represent the community’s interest in the project. The Ocean Beach Pier Task Force includes volunteer community members who were nominated by local advisory groups and representatives from Mayor Gloria’s office, Council District 2 and the City’s Engineering and Capital Projects Department.


Project Timeline*

Timeline for Ocean Beach Pier Renewal project

 


Project Budget*

A project budget will be determined after the preferred alternative is completed. Currently, there is $8.4 million in state funding designated for the project and the City will pursue other state and federal grants.


Upcoming Community Workshops

  • No upcoming community workshops are scheduled at this time.

Past Community Workshops

Workshop #1 - Saturday, April 1, 2023

Full presentation

Workshop highlights

Workshop #2 - Saturday, June 10, 2023

Full presentation

Workshop highlights

Workshop #3 - Saturday, Sept. 9, 2023

Full presentation

Workshop highlights

Workshop #4 - Saturday, April 6, 2024

  • A survey to gather input regarding the specific pier amenities, like lighting and shading options for a potential Ocean Beach Pier replacement, closed on May 7, 2024. The City's consultants are using the input gathered from that survey to create a final design concept, which will be presented to the public in late 2024.

Full presentation

Workshop highlights

Preferred design concept flythrough

Workshop #5

  • Saturday, Oct. 26, from noon to 3 p.m.
    • Liberty Station Conference Center
      • 2600 Laning Road, San Diego, CA 92106
  • Design update and open house
    • During this workshop, the City of San Diego and its consultants will share updates to amenities and features of the preferred pier design concept released in April, based on public input received since its original release. The team will also discuss the next steps for the pier replacement project.

Photos and Videos

Councilmember Campbell on Ocean Beach Pier Renewal


Contact Us

If you have any questions or comments about the Ocean Beach Pier Renewal project, please fill out the form below or email obpierrenewal@sandiego.gov.

Submit Your Questions and Comments

Items marked with an asterisk (*) are required.

*Project timeline and budget are subject to change.