Master Storm Water System Maintenance Program
The Master Storm Water System Maintenance Program (MSWSMP) guided the maintenance of flood control facilities in neighborhoods across the City of San Diego from 2013-2018. The City developed and implemented a new Municipal Waterways Maintenance Program (MWMP) to replace this program. More information on the MWMP can be found here: https://www.sandiego.gov/stormwater/services/wmp. MSWMP related documents can be found below:
Program Environmental Impact Report (EIR) Documents
Addendum to Program Environmental Impact Report (PEIR)
The addendum consists of the addition of two new storm water facilities ( Maps 64a & 130a) to the adopted MMP, the addition of two segments (Map 54) to a facility already included in the MMP, and technical corrections to three (Maps 52, 64, & 132) of the storm water facility maps included in the MMP.
- Master Storm Water System Maintenance Program Recirculated Environmental Impact Report (PDF)
- Appendix A.1 – Notice of Preparations and Responses (PDF)
- Appendix A.2 – Responses to Original Comments to PEIR (PDF)
- Appendix B – Master Storm Water Maintenance Program (Part 1) (PDF)
- Appendix B – Facility Maps 1-53 (PDF)
- Appendix B – Facility Maps 54-72 (PDF)
- Appendix B – Facility Maps 76-98 (PDF)
- Appendix B – Facility Maps 99-123 (PDF)
- Appendix B – Facility Maps 124-147 (PDF)
- Appendix C – Mitigation Monitoring and Reporting Program (PDF)
- Appendix C – General, Community and Area Plans Consistency Evaluation (PDF)
- Appendix D.1 – Biological Resources Report (PDF)
- Appendix D.2 – Vegetation/Wetland Delineation Maps Part 1 (PDF)
- Appendix D.2 – Vegetation/Wetland Delineation Maps Part 2 (PDF)
- Appendix D.2 – Vegetation/Wetland Delineation Maps Part 3 (PDF)
- Appendix D.2 – Vegetation/Wetland Delineation Maps Part 4 (PDF)
- Appendix D.3 – Conceptual Wetlands Restoration Plan (PDF)
- Appendix D.4 – Benthic Macroinvertebrates Letter Report (PDF)
- Appendix E – Historical Resources Report (PDF)
- Appendix F – Water Quality Assessment White Paper (PDF)
Master Maintenance Program
- MMP - Table of Contents - Figures - Appendices List - List of Acronyms (January 2018)
- Master Maintenance Program Sections 1-7
- Master Maintenance Program Figures
- Appendix A: Master Program Storm Water Facilities
- Appendix B – Facility Maps 1-37
- Appendix B - Facility Maps 40-65b
- Appendix B – Facility Maps 65c-86
- Appendix B – Facility Maps 89-109
- Appendix B - Facility Maps 110-131
- Appendix B - Facility Maps 132-147
- Appendix C – Mitigation Monitoring and Reporting Program
- Appendix D – Individual Biological Assessment Report Form
- Appendix E – Individual Historical Assessment Report Form
- Appendix F – Individual Hydrologic and Hydraulic Assessment Report Form
- Appendix G – Individual Water Quality Assessment Form
- Appendix H – Individual Noise Assessment Report Form
- Appendix I – Individual Maintenance Activity Report Form
- Appendix J – Individual Hydrologic and Hydraulic Assessment Report Form
Master Maintenance Program Annual Report
- 2019 Master Storm Water System Maintenance Program Annual Report
- 2018 Master Storm Water System Maintenance Program Annual Report
- 2017 Master Storm Water System Maintenance Program Annual Report
- 2016 Master Storm Water System Maintenance Program Annual Report
- 2015 Master Storm Water System Maintenance Program Annual Report
- 2014 Master Storm Water System Maintenance Program Annual Report (PDF)
Master Maintenance Program Site Development Permit
- Master Maintenance Program Site Development Permit - Amendment
- Master Maintenance Program Site Development Permit (PDF)
- Public Notice: Master Storm Water System Maintenance Program Amendment
Coastal Development Permit
Channel Maintenance Special Studies
- Channel Maintenance Special Study - Sorrento (PDF)
- Channel Maintenance Special Study - Mission Bay (PDF)
- Channel Maintenance Special Study - Murphy Canyon (PDF)
- Channel Maintenance Special Study - Tijuana River (PDF)
Substantial Conformance Review Submittals for Emergency Projects
- Auburn 67/68 Emergency Maintenance SCR Submittal
- Auburn 70 Emergency Maintenance SCR Submittal
- Auburn 77 Emergency Maintenance SCR Submittal
- Chollas Creek (MMP Map 71) Emergency Maintenance SCR Submittal
- Chollas Creek 91/93 Emergency Maintenance SCR Submittal
- Cottonwood Channel Emergency Maintenance SCR Submittal
- Jamacha Channel Emergency Maintenance SCR Submittal
- Lower Chollas Creek Emergency Channel Maintenance (3343 Webster Avenue - 3356 National Avenue)
- Nestor Creek Map 134 Emergency Maintenance – 1760 Palm Ave. SCR Submittal
- Nestor Creek Map 134 Emergency Maintenance – 1788 Palm Ave.
- Parkside Channel Emergency Maintenance SCR Submittal
- Reservoir Drive Emergency Maintenance SCR Submittal
- San Carlos Creek Emergency Maintenance SCR Submittal
- Smythe 130 Emergency Maintenance SCR Submittal
- Sorrento/Soledad Creek & Flintkote Emergency Maintenance SCR Submittal FY11
- Sorrento/Soledad Creek Emergency Maintenance SCR Submittal FY16
- Tripp Industrial SCR/CDP Submittal FY10
- Via de la Bandola Map Emergency Channel Maintenance 130a SCR
- Washington Channel 84 Emergency Maintenance SCR
Substantial Conformance Review Submittals for Priority Facilities
- Alvarado Creek FY 15/16
- Auburn Creek Map 70/76 SCR Submittal FY19
- Mission Bay High School/Pacific Beach Dr. & Olney Street FY 15
- Montezuma Map 66 SCR Submittal FY19
- Murphy Canyon FY 15
- Nestor Map 131 FY 17/18
- Nestor Map 134 SCR Submittal FY19
- Siempre Viva and Bristow SCR Submittal FY19
- Sorrento/ Flintkote Maintenance SCR Submittal FY17
- Sorrento/Soledad Creek & Flintkote Channel Reach 3 & 7 FY 14/15
- South Chollas Creek Map 101 SCR Submittal FY19
- Tijuana River Pilot Channel & Smuggler's Gulch FY 15/16
- Tijuana River Pilot Channel & Smuggler's Gulch FY 16/17
- Tijuana River Pilot Channel & Smuggler's Gulch FY 17/18