Updates Approved for Use - 2021 Standard Drawings
This site includes updates or new Standard Drawings in transition to the next edition of the City of San Diego Standard Drawings that have been approved for use. The inclusion of these drawings in the Contract Documents is the responsibility of the Engineer of Record either by reference or placing the details on the Plans where needed.
For the City Public Works construction contracts, the Engineer of Record must determine if the design is not substantially complete e.g., past 60% and has no significant budgetary implications. Otherwise, case by case review to assess the implications is necessary. When included in the Contract Documents, these drawings will control over the current edition of the City of San Diego Standard Drawings when a conflict arises.
-
SDG-107 PAVEMENT RESTOR FOR AC SURFACED ST - MAJOR EXCAVATION
-
SDG-108 PAVEMENT RESTOR FOR CONCRETE SURFACED ST - MAJOR EXCAVATION
-
SDG-118 NARROW TRENCH EXCAVAND PAVEMENT RESTOR FOR CONCRETE SURFACED ST AND ALLEYS - MINOR EXCAV
- SDG-131 GENERAL CURB RAMP NOTE
- SDG-132 CURB RAMP - TYPE A AND A1
- SDG-133 CURB RAMP TYPE B
- SDG-135 CURB RAMPS - TYPE C1, C2,A ND C3
- SDG-165 MICROTRENCH FOR DRY UTILITIES
- SDG-166 CURB RAMP - TYPE E BLENDED TRANSITION
- SDM-117 ACCESSIBLE PARKING
- SDM-118 PEDESTRIAN PROTECTIVE RAILING & STAIR HANDRAIL
- SDSW-105A DRAINAGE INLET MARKERS
- SDSW-105 CURB-FACE INLET
- SDSW-106 ENERGY DISSIPATION PAD
- SDSW-107 CURB CUT INLET
- SDSW-113 BIOFILTRATION PEDESTRIAN CROSSING
- SDSW-114 BIOFILTRATION CHECK DAM RECYCLED CONCRETE
- SDSW-115 BIOFILTRATION CHECK DAM CAST-IN-PLACE
- SDSW-116 BIOFILTRATION CHECK DAM MASON BLOCK
- SDW-106 BLOW-OFF ASSEMBLIES AT THE END OF PVC AND CAST IRON MAINS
- SDW-114 2-INCH METER BACKFLOW AND METER BOXES
- SDW-137 TRAFFIC RATED COVER AND METER BOX INSTALL
- SDW-143 2-INCH BLOW-OFF INSTALLATION
- SDW-159 2-IN AUTO-COMBO AIR REL AND AIR-VACUUM VALVE INSTAL
- SDW-164 2-IN AUTO-COMBO AIR REL AND AIR-VACUUM VALVE W-BO INSTAL